Sign in

Wave

VENTURA ESTATE DEVELOPERS · Sangareddy · RERA P01100007254

WAVE is a residential apartment project in Kolluru, RC PURAM, Sangareddy. The registered promoter is VENTURA ESTATE DEVELOPERS. The project covers 33,487.73 sq.m and comprises four residential towers, each with 2cellar + 1 Stilt + 36 upper floors, and a separate amenities block with Ground + 4 upper floors; it offers 1,290 3BHK apartments. It is registered under TG-RERA registration P01100007254, and the proposed completion date is 18/02/2029.

More from Ventura Estate Developers · 2 projects →

01What we found

RegisteredTG-RERA
179documents on file - each fact links to its page
2court cases on this project's land (survey 192, Kolluru)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameWAVE RERA record
Project type / phaseResidential apartment project; phase or separately registered portion is not disclosed. RERA record RERA filing
TG-RERA registrationP01100007254; Form C issued 11/11/2023. RERA record Approvals record
Registration validityCertificate states four years, from 11/11/2023 to 18/10/2028; the supplied certificate says it has not been extended. This is the registration period, not the project completion deadline.
Registered promoterVENTURA ESTATE DEVELOPERS. RERA record Corporate record
RERA status in supplied recordRegistration granted; the project header describes status as “New Project.” No completion or occupancy certification is supplied. RERA record Approvals record Document index

Land and geographic identity

FieldProject record
Locality / revenue villageKolluru in the project header; Kollur Village in the HMDA approval and registration certificate. RERA record RERA filing
Mandal / district / PINRC PURAM; Sangareddy; 502032. RERA record RERA filing
Project survey numbers and subdivisions192/AA9/E/2, 192/AA9/E/1/1, 192/AA9/U/1/2, 192/AA9/U/1/1/2, 192/AA9/AA/1/2, 192/AA9/U/1/1/1/2, 192/AA9/AA/1/1, 192/AA9/AA/2, 192/AA9/E/1/2, 192/AA9/U/2. RERA record Land records
Site extent33,487.73 sq.m total area; the RERA land record reports net area 33,487.73 sq.m and affected area 0. RERA filing
Boundaries (RERA-filed)East: ROAD; West: ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA). The approval letter says the permission was delegated to Tellapur Municipality for relevant construction-stage supervision. Approvals record
Principal building-permission reference002812/BP/HMDA/0578/SKP/2023; the filed project information records approved date 18/10/2023. The extracted approval date itself is OCR-rendered as “g-10-2023.” RERA record Approvals record
Approved built-up area234,583.70 sq.m, as recorded in the RERA filing. RERA filing
Approved building arrangementFour residential towers (Towers 1–4), each described as 2cellar + 1 Stilt + 36 upper floors, plus a separate amenities block described as Ground + 4 upper floors.
Parking levels / countTwo cellar levels and a stilt level are shown in the tower configuration. A sanctioned parking-space count is not available in the supplied evidence. RERA unit table
Unit countsRERA unit table: 1,290 3BHK apartments; the same filing table separately lists 5 units under “Club House,” which are not homes for sale. The RERA land details state five building units, including the amenities block. RERA unit table RERA unit details RERA filing
Approved versus filed unitsThe supplied approval extract does not provide a total apartment count. The 1,290 apartment figure is RERA-filed, not an independently reconciled drawing count. RERA unit table RERA unit details

Offering and status

FieldProject record
Home configuration3BHK. RERA unit table RERA unit details
RERA-filed saleable area171.05 sq.m per 3BHK apartment. RERA unit table RERA unit details
Booked / available567 booked; 723 available for 3BHK, as last read from the TG-RERA portal. The portal record supplied has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageNo overall construction-stage percentage or independently verified site-progress report is supplied. RERA-filed infrastructure progress entries report sewerage at 45%, storm-water drains at 10%, and fire protection/fire safety requirements at 50%; these are filed status figures, not independent site verification. RERA amenities
Completion deadlinePromoter Form B declares completion by 18 October 2028; the project header lists proposed completion 18/02/2029. These are recorded as separate supplied completion-date fields; the record does not identify one as a revised date. RERA record
Occupancy / completion certificateNo OC or completion certificate for the project or any tower is supplied. The HMDA permission says occupation is to follow completion in accordance with approved plans and issue of a “Fit for Occupancy” certificate by HMDA. Document index

2. The project story

WAVE is registered as a residential apartment project at Kollur/Kolluru Village, RC PURAM Mandal, Sangareddy District. Its RERA-filed land extent is 33,487.73 sq.m, across the ten survey subdivisions listed above. The HMDA permission describes a multi-tower development: four residential towers, each with two cellar levels, a stilt and 36 upper floors, alongside a separate amenities block with ground and four upper floors. RERA record Land records

The RERA filing offers 3BHK apartments. It records 1,290 such units, with 567 booked and 723 available in the portal snapshot supplied; the snapshot is undated. A separate five-unit “Club House” row in the unit table is not a home offering. RERA unit table RERA unit details

The supplied records do not establish a current overall construction percentage, completed tower, or occupied phase. The infrastructure percentages in the filing are limited to the particular items reported in the at-a-glance table; they should not be read as an overall project-completion measure. No occupancy or completion certificate is included. RERA amenities Document index

3. Master plan, architecture & building design

The RERA filing reports total site area of 33,487.73 sq.m, net area of 33,487.73 sq.m, and approved built-up area of 234,583.70 sq.m. The HMDA approval letter describes four residential towers—Towers 1–4—with 2cellar + 1 Stilt + 36 upper floors each, and a separate amenities block with Ground + 4 upper floors. RERA filing RERA filing

The HMDA letter requires construction to follow the sanctioned plan, prohibits parking or construction in setback areas, and specifies one entry and one exit to the premises, each with a minimum width of 4.5 mtrs and height clearance of 5 mtrs. The supplied material does not provide a reliable tower-by-tower footprint, total flats per floor, complete circulation plan, or dimensioned open-space schedule.

The RERA filing identifies a single 3BHK configuration. No carpet-area figure has been measured from the supplied drawings: all 64 drawings are listed as scans pending measurement. The RERA-filed saleable area is therefore reported separately from any drawing-derived carpet measurement. RERA unit details Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1,290567723171.05 sq.mNot measuredNot supplied

The unit counts, booking counts and saleable area above are RERA-filed. The supplied floor-plan set contains 64 scans, with 0 measured and 64 scans pending; there is therefore no software-measured carpet area or room-dimension analysis to report. RERA unit details Floor plans

Saleable area and carpet area are different measures: the filed saleable figure is not a carpet-area measurement and can include a proportionate share of common areas. The filing does not separately quantify carpet, balcony or utility area, or loading for this configuration. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA permission describes two cellar levels and a stilt level in each of the four residential towers. It also requires a single entry and exit to the premises, each with minimum width 4.5 mtrs and height clearance 5 mtrs, and states that no parking or construction is to be made in setback areas.

A sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, and details of ramps, internal driveways, EV charging or pedestrian separation are not available in the supplied project-specific evidence. The presence of cellar and stilt levels does not establish an individual buyer’s parking allocation. RERA unit table Document index

6. Amenities, recreation & open spaces

Separate amenities block
Description / sizeGround + 4 upper floors; facility-by-facility layout and sizes are not stated in the extracted approval.
Evidence sourceHMDA permission
Declared progress / verified statusApproved building component; no completion status supplied.
Club house
Description / sizeRERA unit table lists “CLUB HOUSE” as 5 units, total saleable area 883.1 sq.m; these are not homes for sale.
Evidence sourceRERA filing RERA unit table
Declared progress / verified statusNo completion status supplied.
Green strip / tot lot / park
Description / sizeListed as available in the RERA infrastructure table; no dimensions supplied.
Evidence sourceRERA filing RERA amenities
Declared progress / verified status0% reported.
Community buildings
Description / sizeListed as available in the RERA infrastructure table; no further size or facility schedule supplied.
Evidence sourceRERA filing RERA amenities
Declared progress / verified status0% reported.
Recreational open space
Description / sizeAggregate area of recreational open space is listed; area is not supplied.
Evidence sourceRERA filing RERA amenities
Declared progress / verified status0% reported.
Clubhouse, pool, sports and other advertised facilities
Description / sizeA third-party vendor record lists facilities including a pool, gym, indoor games, courts, jogging track and “Rooftop Wave Deck”; these are vendor-listed, not established here as RERA-filed, sanctioned or delivered facilities.
Evidence sourceVendor listing Promoter website
Declared progress / verified statusNo verified completion status supplied.

The RERA infrastructure table also lists internal roads and footpaths and street lighting, each at 0% reported. RERA amenities

7. Utilities, building services & safety

Service / safety itemSupplied evidence
WaterThe HMDA permission requires underground and terrace water storage tanks, but the principal approval extract contains OCR-rendered capacity figures (“25.000 Its Capacity” and “25,000 lits capacity”). It also refers to a sump, water-harvesting structures and payment of proportionate pro-rata charges to the Hyderabad Metropolitan Water Supply & Sewerage Board when demanded. The source and dependable total storage capacity are not established here.
Sewerage and drainageHMDA’s permission requires an STP and use of recycled water for gardening, and refers to sump, septic tank and water-harvesting pits. The RERA infrastructure table reports sewerage at 45% and treatment/disposal of sewage and sullage water at 0%; these are filed progress figures, not independently verified. RERA amenities
Storm water and rainwaterRainwater-harvesting structures are required by the HMDA permission. The RERA infrastructure table lists storm-water drains at 10% and water conservation/rainwater harvesting at 0%. RERA amenities
Electrical servicesThe HMDA permission requires a transformer, generator as an alternate power source, and certified electrical wiring and installation. No transformer or generator capacity is supplied.
Fire and life safetyHMDA’s permission sets out fire-safety conditions, including fire extinguishers, manually operated alarm systems, hose reel/down-comer provision and sprinklers if basement area exceeds 200 Sq.mtrs. It requires clearance from the T.S. Fire Services Department before applying for occupancy certification. The RERA filing reports fire protection/fire safety at 50%; this is a filed progress figure, not a finding of completed compliance. RERA amenities
Waste and building servicesThe HMDA letter requires a garbage house and refuse-chute with a garbage-disposal system. The RERA filing lists solid-waste management and disposal at 0%. No separate capacity or operating details are supplied. RERA amenities
Lifts, accessibility and securityThe supplied project-specific evidence does not establish lift count or capacity, accessible circulation, CCTV, access-control or security arrangements. Document index

8. Location, access & connectivity

The registered project location is Kolluru/Kollur Village, RC PURAM Mandal, Sangareddy District, PIN 502032, on the ten survey subdivisions listed in the land-identity table. The HMDA permission gives the site boundaries as road to the east and west and other land to the north and south in the RERA-filed land details. RERA record RERA filing

The location record supplies a cadastral parcel centroid at 17.41528, 78.35459 and one measured connectivity point: Financial District (Nanakramguda), 1.2 km. No additional measured approach-road or public-transport distances are supplied. Location record

9. Developer & development status

The registered promoter is VENTURA ESTATE DEVELOPERS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AAVFV3028N1ZE. The RERA filing lists the promoter’s address as Raghava Pride, Road No 10, Kolluru, RC PURAM, Sangareddy, 502032. The registration certificate separately prints a promoter-office field as “Village: Mandal: District: Hyderabad, Pin: 500034.” No official promoter website or contact details are supplied here. Corporate record Parties record RERA filing

The promoter’s Form B affidavit, dated 18.10.2023, declares that it has legal title and enclosed title authentication and an owner-promoter development agreement, states that the land is free from encumbrances, and undertakes completion by 18 October 2028. These are promoter declarations in the registration material.

No tower-wise construction progress or completed/occupied portion is established by the supplied records. The project header separately gives proposed completion 18/02/2029; the certificate’s registration-validity date and the promoter’s completion undertaking are distinct items, as shown above. RERA record

10. Approvals, official records & documents

RecordWhat the supplied project file establishes
TG-RERA registration certificateForm C for WAVE, registration P01100007254, issued 11/11/2023; valid to 18/10/2028 unless extended by the Authority.
Principal HMDA building permissionApproval number 002812/BP/HMDA/0578/SKP/2023; approval letter describes four residential towers and a separate amenities block, with site extent 33,487.73 Sq.mts.
Form B declarationPromoter affidavit by authorised signatory Harsha Reddy Ponguleti, dated 18.10.2023, including title, encumbrance and completion declarations.
Filed tower/floor-plan materialRERA file contains numerous plan documents, including IDs 368236–368299. Their extracted descriptions include many proposed or technical-approval drawings and floor-plan sheets; the supplied records do not establish that each is a final sanction for this project. Document index
Completion / occupancy recordsNo project completion certificate or occupancy certificate is supplied. The HMDA permission states that occupation follows completion to the approved plan and issue of an HMDA “Fit for Occupancy” certificate. Document index
Other project-specific official records in the permissionThe approval letter references environmental-clearance ID NO.EC23B039TG110880 and file SIA/TG/INFRA2/418331/2023, each dated 01/05/2023. The supplied approval extract records these references; it does not provide the underlying clearance documents.

Frequently asked questions

Is WAVE registered with Telangana RERA?

Yes. WAVE is registered with the Telangana Real Estate Regulatory Authority as P01100007254; the registration status is New Project.

Who is the developer of WAVE?

The promoter named in the RERA registration is VENTURA ESTATE DEVELOPERS.

Where is WAVE located?

WAVE is in KOLLURU, RC PURAM, Sangareddy, Telangana (502032).

When will WAVE be completed?

The promoter's proposed date of completion filed with RERA is 18/02/2029. This is the promoter's declaration, not a guarantee.

More projects in Kollur