S.V.SESHADRI
S. V. SAI BUILDERS · Medchal-Malkajgiri · RERA P02200003465
S.V.SESHADRI is a residential apartment project in Pocharam, Ghatkesar Mandal, Medchal-Malkajgiri District, developed by the registered promoter S. V. SAI BUILDERS. The project covers 1,632.18 sq. m and comprises one residential apartment building with 1 Stilt + 5 Upper floors and 40 2BHK apartments, each with a RERA-filed saleable area of 89.0 sq. m. Its TG-RERA registration number is P02200003465, and the RERA filing proposes completion by 22/05/2027.
More from S. V. Sai Builders · 7 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | S.V.SESHADRI RERA record |
| Project type / status | Residential apartment project; recorded as a “New Project” RERA record |
| Phase / registered portion | No separate phase name is disclosed. The registration record covers the project on Plot No. 60/B/2, Survey No. 60, Pocharam RERA record |
| TG-RERA registration | P02200003465 |
| Registration validity | 24/09/2021–22/01/2027, subject to extension by the Authority |
| Registered promoter | S. V. SAI BUILDERS RERA record |
| RERA status | The supplied Form ‘C’ records registration under section 5. Current registration status beyond the certificate’s stated validity is not established by this record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Pocharam / Pocharam RERA record |
| Mandal / district / PIN | Ghatkesar / Medchal-Malkajgiri / 500088 RERA record |
| Project survey identity | Survey No. 60; the RERA filing identifies Plot No. 60/B/2. No project-specific subdivision is stated in the supplied project documents RERA record |
| Registered site extent | 1,632.18 sq. m RERA record |
| Total / net area in filing | Total area 1,632.18 sq. m; net area 1,632.18 sq. m RERA filing |
| Boundaries recorded in filing | North: Part No. 60 by C; South: Part No. 60 by B by 1; East: 20 feet passage and part No. 60 by P with 20 ft passage; West: Survey No. 42 RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | HMDA technical approval, with building permit issued by Municipal Council, Pocharam |
| Principal approval | HMDA technical approval 019785/GHT/R1/U6/HMDA/31012019, dated 23/01/2021; Pocharam building permit file G1/BP/615/2020, dated 23.03.2021 |
| Approved built-up area | Pocharam building-permit record lists “Ground Use Area” 4188.15 m²; HMDA technical approval separately lists “Built up Area” 3425.75 m² and “Total Built up Area” 4179.89 sq. m. These are retained as separately labelled figures from the respective records |
| Building arrangement / floors | One residential apartment building; 1 Stilt + 5 Upper floors in the building-permit record RERA filing |
| Parking level | One stilt parking floor; listed area 730.96 m² |
| Unit count | Approved-plan count: 40 apartments as reflected in the RERA unit record; RERA-declared count: 40 RERA unit table RERA unit details |
| Other building-height record | HMDA technical approval lists height 14.4; the Pocharam permit lists 14.44 Sq.mts. The supplied records do not clarify the unit notation for these entries |
Offering and status
| Item | Record |
|---|---|
| Configuration | 2BHK apartments RERA unit table |
| RERA-filed saleable area | 89.0 sq. m per unit RERA unit table RERA unit details |
| Booked / available | 0 booked / 40 available, as read from the TG-RERA portal; the record gives no as-of date, so counts are indicative RERA unit table |
| Construction stage | No reliable construction-progress percentage or independently verified site-progress record is supplied. The amenities record shows 0% progress for listed items RERA amenities |
| Completion dates | RERA filing proposes completion by 22/05/2027 RERA record. Form B separately records a promoter undertaking to complete by 23rd January, 2027 |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied for the building; the approval records state that an occupancy certificate is to be applied for after completion |
2. The project story
S.V.SESHADRI is a registered residential apartment project on Plot No. 60/B/2 in Survey No. 60, Pocharam, within Ghatkesar Mandal, Medchal-Malkajgiri District. The RERA filing describes a single building and 40 proposed apartments; the building-permit record specifies one stilt level and five upper floors. RERA record RERA filing
The project offers 2BHK apartments, with 40 units recorded and 89.0 sq. m saleable area per unit in the RERA unit data. Portal booking figures show 0 booked and 40 available, but have no stated as-of date. RERA unit table RERA unit details
The available material establishes approvals and declared project information, not current physical completion. No independently verified construction progress is supplied, and no occupancy or completion certificate is included. The promoter’s Form B undertaking gives 23rd January, 2027 as the completion date; the project header gives 22/05/2027 as the proposed completion date. RERA record RERA amenities
3. Master plan, architecture & building design
The project site is recorded as 1,632.18 sq. m, both total and net area. The building-permit record describes one residential apartment building with 1 Stilt + 5 Upper floors. It records a parking-floor area of 730.96 m², “Ground Use Area” of 4188.15 m², and 6 rainwater-harvesting pits/structures. RERA filing
The HMDA technical approval lists “Built up Area” 3425.75 and “Total Built up Area” 4179.89 Sq.mts; these labels and figures are reproduced as stated in that approval and are not treated as interchangeable with saleable or carpet area.
The permit records 30 trees and requires the designated open space to remain open and landscaped. The supplied extracts do not establish the precise building footprint, flat arrangement per floor, lift or stair layout, or dimensions and distribution of common areas.
4. Homes, configurations & floor plans
The supplied floor-plan set contains one drawing, but no flats were measured from it; therefore, no software-measured carpet area or room dimensions can be reported. Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 89.0 sq. m | Not measured | Not supplied |
Saleable area is the RERA-filed area; the supplied data does not provide carpet area, exclusive balcony or utility area, or loading for these units. The floor-plan measurement record notes that drawing-based carpet-area measurements, where available, would be software measurements rather than RERA disclosures. RERA unit details Floor plans
5. Parking & vehicle circulation
The HMDA technical approval requires one entry and one exit, each with a minimum width of 4.5 mts and height clearance of 5 mts.
The supplied records do not state the number of car or two-wheeler spaces, visitor or accessible parking, EV charging, ramp arrangement, or unit-specific parking allocation. The approved parking area alone does not establish an individual allottee’s exclusive parking rights. RERA unit details
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure and facility items. It marks water supply, sewerage, green strip/tot-lot/park, rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES”; listed progress percentages are 0%. The approval records include requirements for a tot-lot, rainwater harvesting, a transformer and a garbage house. These records do not establish that the facilities have been completed or independently verified. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community Buildings | Listed; no description or size supplied | RERA amenities | 0%; completion not independently verified |
| Green strip / tot-lot / park | Listed as available “YES”; tot-lot is also a condition in the HMDA approval | RERA amenities | 0% in amenities record; completion not independently verified |
| Trees / greenery | 30 trees recorded in the building-permit parameters; open space is to be maintained with greenery | Approved/required provision; delivered status not verified | |
| Internal roads & footpaths | Listed; no dimensions supplied | RERA amenities | 0%; completion not independently verified |
| Street lighting | Listed; no details supplied | RERA amenities | 0%; completion not independently verified |
| Recreational open space | Listed; aggregate area not supplied | RERA amenities | 0%; completion not independently verified |
7. Utilities, building services & safety
The building-permit conditions require water supply, drainage and sewerage disposal, an ETP as per the submitted proposal, a transformer, a garbage facility, and rainwater harvesting; the HMDA approval also requires rainwater-harvesting structures. These are approval conditions or recorded declarations, not independent confirmation of installed or operating services. RERA amenities
| Evidence in supplied records | RERA amenities record: “YES”; permit requires water-supply arrangements RERA amenities |
|---|---|
| Status / limitation | Source, storage, treatment and capacity not disclosed; completion not verified |
| Evidence in supplied records | Sewerage listed “YES”; permit requires drainage, sewerage disposal and ETP RERA amenities |
|---|---|
| Status / limitation | System capacity and operating status not supplied |
| Evidence in supplied records | Storm-water drains listed; rainwater harvesting listed “YES”; permit records 6 RWHPs RERA amenities |
|---|---|
| Status / limitation | Installed status and capacities not verified |
| Evidence in supplied records | Electrical meter room/sub-station/receiving station listed “YES”; approvals require transformer provision RERA amenities |
|---|---|
| Status / limitation | Supply, backup and commissioning details not supplied |
| Evidence in supplied records | Fire-protection item listed; permit requires compliance with Fire Service norms and the National Building Code RERA amenities |
|---|---|
| Status / limitation | No fire clearance or installed-system details supplied |
| Evidence in supplied records | Solid-waste management listed; approvals require a garbage facility/house RERA amenities |
|---|---|
| Status / limitation | Segregation and operating arrangements not supplied |
| Evidence in supplied records | No lift, accessible-circulation, CCTV or access-control details supplied |
|---|---|
| Status / limitation | Not disclosed in supplied records |
8. Location, access & connectivity
The supplied location data gives approximate distances from the project parcel centroid to selected anchors and nearby facilities. No travel times or public-transport details are supplied. Location record
| Nearby anchor / facility | Supplied distance |
|---|---|
| Outer Ring Road (nearest sampled interchange, approx) | 3.7 km |
| Syndicate Bank | 2.8 km |
| Princeton Institute of Engineering & Technology For Women | 1.9 km |
| Shri Wazra Multi Speciality Hospitals | 1.8 km |
| Reliance Digital | 2.2 km |
| Park | 1.1 km |
9. Developer & development status
The registered promoter is S. V. SAI BUILDERS, recorded as a partnership, with GSTIN 36ABBFS8599Q1ZZ. The supplied promoter address is S.V PLAZA, MIGH 10, Pocharam Muncipality, Pocharam, Ghatkesar, Medchal-Malkajgiri, 500088. The RERA record names Pulluri Upendar and Pulluri Suryakala as partners and authorized signatories. RERA record Corporate record Parties record
The Form B declaration is signed by PULLURI UPENDER, designated partner, and includes promoter declarations about title, encumbrances, project funds and pending approvals, as well as the completion undertaking dated 23rd January, 2027. These are promoter declarations, not independent verification of the stated matters.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form ‘C’ records project S.V.SESHADRI, registration P02200003465, dated 24/09/2021 and valid through 22/01/2027 |
| HMDA technical approval | 019785/GHT/R1/U6/HMDA/31012019, dated 23/01/2021; residential building on Survey No. 60, Plot No. 60/B/2 |
| Pocharam building permit | File G1/BP/615/2020, dated 23.03.2021; residential building, 1 Stilt + 5 Upper floors |
| Form B declaration | Promoter declaration by PULLURI UPENDER, designated partner, including project disclosures and a completion undertaking |
| Title report and title instruments | Advocate’s title-search report, sale deeds, development agreement-cum-GPA and mortgage information are included in the supplied project documents; detailed title analysis is addressed in the Land & Title section |
| Building-plan / floor-plan detail | One floor-plan drawing is recorded, but no flats were measured from the supplied drawing set Floor plans |
| Occupancy / completion certificate | Not supplied; approval documents state that an occupancy certificate is required before occupation |
1. Project at a glance
Project identity
Registered project name: S.V.SESHADRI
Project type / status: Residential apartment project; recorded as a “New Project”
Phase / registered portion: No separate phase name is disclosed. The registration record covers the project on Plot No. 60/B/2, Survey No. 60, Pocharam
TG-RERA registration: P02200003465
Registration validity: 24/09/2021–22/01/2027, subject to extension by the Authority
Registered promoter: S. V. SAI BUILDERS
RERA status: The supplied Form ‘C’ records registration under section 5. Current registration status beyond the certificate’s stated validity is not established by this record
Land and geographic identity
Locality / revenue village: Pocharam / Pocharam
Mandal / district / PIN: Ghatkesar / Medchal-Malkajgiri / 500088
Project survey identity: Survey No. 60; the RERA filing identifies Plot No. 60/B/2. No project-specific subdivision is stated in the supplied project documents
Registered site extent: 1,632.18 sq. m
Total / net area in filing: Total area 1,632.18 sq. m; net area 1,632.18 sq. m
Boundaries recorded in filing: North: Part No. 60 by C; South: Part No. 60 by B by 1; East: 20 feet passage and part No. 60 by P with 20 ft passage; West: Survey No. 42
Development identity
Sanctioning authority: HMDA technical approval, with building permit issued by Municipal Council, Pocharam
Principal approval: HMDA technical approval 019785/GHT/R1/U6/HMDA/31012019, dated 23/01/2021; Pocharam building permit file G1/BP/615/2020, dated 23.03.2021
Approved built-up area: Pocharam building-permit record lists “Ground Use Area” 4188.15 m²; HMDA technical approval separately lists “Built up Area” 3425.75 m² and “Total Built up Area” 4179.89 sq. m. These are retained as separately labelled figures from the respective records
Building arrangement / floors: One residential apartment building; 1 Stilt + 5 Upper floors in the building-permit record
Parking level: One stilt parking floor; listed area 730.96 m²
Unit count: Approved-plan count: 40 apartments as reflected in the RERA unit record; RERA-declared count: 40
Other building-height record: HMDA technical approval lists height 14.4; the Pocharam permit lists 14.44 Sq.mts. The supplied records do not clarify the unit notation for these entries
Offering and status
Configuration: 2BHK apartments
RERA-filed saleable area: 89.0 sq. m per unit
Booked / available: 0 booked / 40 available, as read from the TG-RERA portal; the record gives no as-of date, so counts are indicative
Construction stage: No reliable construction-progress percentage or independently verified site-progress record is supplied. The amenities record shows 0% progress for listed items
Completion dates: RERA filing proposes completion by 22/05/2027. Form B separately records a promoter undertaking to complete by 23rd January, 2027
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied for the building; the approval records state that an occupancy certificate is to be applied for after completion
2. The project story
S.V.SESHADRI is a registered residential apartment project on Plot No. 60/B/2 in Survey No. 60, Pocharam, within Ghatkesar Mandal, Medchal-Malkajgiri District. The RERA filing describes a single building and 40 proposed apartments; the building-permit record specifies one stilt level and five upper floors.
The project offers 2BHK apartments, with 40 units recorded and 89.0 sq. m saleable area per unit in the RERA unit data. Portal booking figures show 0 booked and 40 available, but have no stated as-of date.
The available material establishes approvals and declared project information, not current physical completion. No independently verified construction progress is supplied, and no occupancy or completion certificate is included. The promoter’s Form B undertaking gives 23rd January, 2027 as the completion date; the project header gives 22/05/2027 as the proposed completion date.
3. Master plan, architecture & building design
The project site is recorded as 1,632.18 sq. m, both total and net area. The building-permit record describes one residential apartment building with 1 Stilt + 5 Upper floors. It records a parking-floor area of 730.96 m², “Ground Use Area” of 4188.15 m², and 6 rainwater-harvesting pits/structures.
The HMDA technical approval lists “Built up Area” 3425.75 and “Total Built up Area” 4179.89 Sq.mts; these labels and figures are reproduced as stated in that approval and are not treated as interchangeable with saleable or carpet area.
The permit records 30 trees and requires the designated open space to remain open and landscaped. The supplied extracts do not establish the precise building footprint, flat arrangement per floor, lift or stair layout, or dimensions and distribution of common areas.
4. Homes, configurations & floor plans
The supplied floor-plan set contains one drawing, but no flats were measured from it; therefore, no software-measured carpet area or room dimensions can be reported.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 40 | 0 | 40 | 89.0 sq. m | Not measured | Not supplied |
Saleable area is the RERA-filed area; the supplied data does not provide carpet area, exclusive balcony or utility area, or loading for these units. The floor-plan measurement record notes that drawing-based carpet-area measurements, where available, would be software measurements rather than RERA disclosures.
5. Parking & vehicle circulation
The HMDA technical approval requires one entry and one exit, each with a minimum width of 4.5 mts and height clearance of 5 mts.
The supplied records do not state the number of car or two-wheeler spaces, visitor or accessible parking, EV charging, ramp arrangement, or unit-specific parking allocation. The approved parking area alone does not establish an individual allottee’s exclusive parking rights.
6. Amenities, recreation & open spaces
The RERA amenities record lists 14 infrastructure and facility items. It marks water supply, sewerage, green strip/tot-lot/park, rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES”; listed progress percentages are 0%. The approval records include requirements for a tot-lot, rainwater harvesting, a transformer and a garbage house. These records do not establish that the facilities have been completed or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community Buildings | Listed; no description or size supplied | 0%; completion not independently verified | |
| Green strip / tot-lot / park | Listed as available “YES”; tot-lot is also a condition in the HMDA approval | 0% in amenities record; completion not independently verified | |
| Trees / greenery | 30 trees recorded in the building-permit parameters; open space is to be maintained with greenery | Approved/required provision; delivered status not verified | |
| Internal roads & footpaths | Listed; no dimensions supplied | 0%; completion not independently verified | |
| Street lighting | Listed; no details supplied | 0%; completion not independently verified | |
| Recreational open space | Listed; aggregate area not supplied | 0%; completion not independently verified |
7. Utilities, building services & safety
The building-permit conditions require water supply, drainage and sewerage disposal, an ETP as per the submitted proposal, a transformer, a garbage facility, and rainwater harvesting; the HMDA approval also requires rainwater-harvesting structures. These are approval conditions or recorded declarations, not independent confirmation of installed or operating services.
| Evidence in supplied records | RERA amenities record: “YES”; permit requires water-supply arrangements |
|---|---|
| Status / limitation | Source, storage, treatment and capacity not disclosed; completion not verified |
| Evidence in supplied records | Sewerage listed “YES”; permit requires drainage, sewerage disposal and ETP |
|---|---|
| Status / limitation | System capacity and operating status not supplied |
| Evidence in supplied records | Storm-water drains listed; rainwater harvesting listed “YES”; permit records 6 RWHPs |
|---|---|
| Status / limitation | Installed status and capacities not verified |
| Evidence in supplied records | Electrical meter room/sub-station/receiving station listed “YES”; approvals require transformer provision |
|---|---|
| Status / limitation | Supply, backup and commissioning details not supplied |
| Evidence in supplied records | Fire-protection item listed; permit requires compliance with Fire Service norms and the National Building Code |
|---|---|
| Status / limitation | No fire clearance or installed-system details supplied |
| Evidence in supplied records | Solid-waste management listed; approvals require a garbage facility/house |
|---|---|
| Status / limitation | Segregation and operating arrangements not supplied |
| Evidence in supplied records | No lift, accessible-circulation, CCTV or access-control details supplied |
|---|---|
| Status / limitation | Not disclosed in supplied records |
8. Location, access & connectivity
The supplied location data gives approximate distances from the project parcel centroid to selected anchors and nearby facilities. No travel times or public-transport details are supplied.
Outer Ring Road (nearest sampled interchange, approx): 3.7 km
Syndicate Bank: 2.8 km
Princeton Institute of Engineering & Technology For Women: 1.9 km
Shri Wazra Multi Speciality Hospitals: 1.8 km
Reliance Digital: 2.2 km
Park: 1.1 km
9. Developer & development status
The registered promoter is S. V. SAI BUILDERS, recorded as a partnership, with GSTIN 36ABBFS8599Q1ZZ. The supplied promoter address is S.V PLAZA, MIGH 10, Pocharam Muncipality, Pocharam, Ghatkesar, Medchal-Malkajgiri, 500088. The RERA record names Pulluri Upendar and Pulluri Suryakala as partners and authorized signatories.
The Form B declaration is signed by PULLURI UPENDER, designated partner, and includes promoter declarations about title, encumbrances, project funds and pending approvals, as well as the completion undertaking dated 23rd January, 2027. These are promoter declarations, not independent verification of the stated matters.
10. Approvals, official records & documents
TG-RERA registration: Form ‘C’ records project S.V.SESHADRI, registration P02200003465, dated 24/09/2021 and valid through 22/01/2027
HMDA technical approval: 019785/GHT/R1/U6/HMDA/31012019, dated 23/01/2021; residential building on Survey No. 60, Plot No. 60/B/2
Pocharam building permit: File G1/BP/615/2020, dated 23.03.2021; residential building, 1 Stilt + 5 Upper floors
Form B declaration: Promoter declaration by PULLURI UPENDER, designated partner, including project disclosures and a completion undertaking
Title report and title instruments: Advocate’s title-search report, sale deeds, development agreement-cum-GPA and mortgage information are included in the supplied project documents; detailed title analysis is addressed in the Land & Title section
Building-plan / floor-plan detail: One floor-plan drawing is recorded, but no flats were measured from the supplied drawing set
Occupancy / completion certificate: Not supplied; approval documents state that an occupancy certificate is required before occupation
Frequently asked questions
Is S.V.SESHADRI registered with Telangana RERA?
Yes. S.V.SESHADRI is registered with the Telangana Real Estate Regulatory Authority as P02200003465; the registration status is New Project.
Who is the developer of S.V.SESHADRI?
The promoter named in the RERA registration is S. V. SAI BUILDERS.
Where is S.V.SESHADRI located?
S.V.SESHADRI is in Pocharam, Ghatkesar, Medchal-Malkajgiri, Telangana (500088).
When will S.V.SESHADRI be completed?
The promoter's proposed date of completion filed with RERA is 22/05/2027. This is the promoter's declaration, not a guarantee.
More projects in Pocharam