Madhuri Avaas
SUNSHINE CONSTRUCTIONS · Sangareddy · RERA P01100004076
MADHURI AVAAS is a residential apartment project in KOLLUR ORRGC, RC PURAM mandal, Sangareddy district, developed by the registered promoter SUNSHINE CONSTRUCTIONS. The RERA land record states a total and net area of 2008.17 sq m, with one building comprising 1 Cellar + 1 Ground + 5 upper floors and 15 3BHK homes. Its TG-RERA registration is P01100004076, and the proposed completion date is 30/11/2026.
More from Sun Shine Constructions · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MADHURI AVAAS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registration covers one building RERA filing |
| TG-RERA registration | P01100004076 Approvals record |
| Registration validity | Issued 04/02/2022; stated to run through 07/05/2026, unless extended by the Authority. This is registration validity, not the construction completion date. |
| Registered promoter | SUNSHINE CONSTRUCTIONS; partnership RERA filing Parties record |
| RERA status in supplied record | New Project; registration certificate supplied. No extension is recorded in the certificate data. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | KOLLUR ORRGC RERA record RERA filing |
| Revenue village | KOLLUR; the filed approval also describes the location as Kollur-ORRGC / Kolluru Village. RERA record RERA filing |
| Mandal | RC PURAM; the approval document states Ramchandrapuram-ORRGC. RERA record |
| District / PIN | Sangareddy / 502300 RERA record |
| Survey number(s) | 193/E2 (also written “193/e2” in the approval document) RERA record Land records |
| Registered site extent | No single registered site-extent figure is identified in the supplied identity data. The RERA land record states total area 2008.17 sq m and net area 2008.17 sq m; affected area recorded as 0. RERA filing Land records |
| Approval-document extent | 1,013.13 Sq. Mt. is stated in the HMDA technical approval. |
| Boundaries in RERA land record | East: CTS NO; West: ROAD WIDTH 9; North: CTS NO; South: ROAD WIDTH 12. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval names Tellapur Municipality as the delegated local executive authority for sanction. Approvals record |
| Principal filed plan approval number | 036326/SKP/R1/U6/HMD RERA filing Approvals record |
| HMDA technical approval number / date | 036326/5KP/R1/U6/HMDA/08062020, approved 07/05/2021. Approvals record |
| Approved built-up area | 2755.98 sq m in the RERA project fields; the technical approval states “Built up Area 2756”. RERA filing |
| Building count | One building; the technical approval labels it Residential A (PROP). RERA filing |
| Sanctioned floor configuration | 1 Cellar + 1 Ground + 5 upper floors. Height stated in the approval parameters: 17.99 (unit not specified in the supplied extraction). |
| Parking levels / provision | One cellar is shown in the proposed floor configuration. A sanctioned parking count or parking allocation is not available in the supplied records. |
| Unit counts | 15 total units in the TG-RERA unit record; one approved building. RERA unit table RERA filing |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 15 units, 0 booked and 15 available in the portal record. The portal extract has no as-of date, so counts are indicative. RERA unit table |
| RERA-filed saleable area | 198.86 sq m per 3BHK configuration. RERA unit table RERA unit details |
| Construction stage | No construction-progress percentage or independently verified site-stage evidence is supplied. The RERA amenities record shows 0% for its listed progress fields; this does not establish physical site progress. RERA amenities |
| Completion dates | The registration certificate and Form-B declaration state 07/05/2026; the project header gives a proposed completion date of 30/11/2026. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The HMDA technical approval states that an Occupancy Certificate is compulsory before occupation. |
2. The project story
MADHURI AVAAS is recorded with TG-RERA as a residential apartment project at Kollur, in the RC PURAM mandal, Sangareddy district, on Survey No. 193/E2. The filing describes one building and a 15-home 3BHK offering. The RERA unit record lists all 15 units as available and none as booked, but provides no booking-record as-of date. RERA record Land records RERA unit table
The filed HMDA technical approval describes a proposed residential building with one cellar, a ground floor and five upper floors. It identifies a 1,013.13 Sq. Mt. extent and records requirements relating to the approach/master-plan road and occupancy certification. The available documents do not establish a current construction stage, completion of any part of the building, or an issued OC; physical progress has not been independently verified in this evidence set. RERA amenities
The RERA certificate records validity through 07/05/2026, while the project record also gives a proposed completion date of 30/11/2026. These are separate project fields: registration validity and the stated completion date are not interchangeable. No extension decision or occupancy certificate is included in the supplied materials. RERA record
3. Master plan, architecture & building design
The RERA record describes a 2008.17 sq m total and net land area, with 0 recorded as road-widening/FTL/nala-widening affected area in its land fields. The HMDA technical approval separately states an extent of 1,013.13 Sq. Mt. and approves building parameters including a built-up area of 2756 and a proposed configuration of 1 Cellar + 1 Ground + 5. The RERA filing states approved built-up area as 2755.98 sq m. These figures are reported as recorded; no area derivation is made here. RERA filing RERA filing
The approval describes one proposed residential building, block A (PROP), with a stated height of 17.99 (unit not specified in the extraction). The available materials do not provide a verified floor-by-floor unit schedule, building footprint, number of flats per floor, lift/stair details, internal circulation plan, landscaping plan, or phase-level organization. The RERA record gives one building and 15 units. RERA filing RERA unit table
The filed technical approval identifies Transformer, Garbage house, ETP and rainwater-harvesting structures as provisions, and contains an approach-road/master-plan-road condition before release of OC. The supplied evidence does not establish that these works are complete. No FSI-counted area, carpet-area total for the project, or separately identified common-area area is available.
4. Homes, configurations & floor plans
The TG-RERA filing records 15 3BHK homes, with 0 booked and 15 available in the portal extract. The portal extract has no as-of date. Its saleable-area figure is 198.86 sq m. A software measurement from the supplied floor-plan drawing is reported separately below; it is not a RERA-filed carpet-area declaration and is identified as requiring review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 198.86 sq m | 155.9 sq m median (155.9 sq m min–max); software-measured from drawing, needs review | 22% (software-derived record) |
The measured drawing sample labels living/drawing, dining, kitchen, three bedrooms, toilets and a wash area. The sample lists room dimensions including living/drawing room 4.97 m × 5.82 m, dining 4.6 m × 5.82 m, and kitchen 2.92 m × 3.79 m. These are software-measured from drawing geometry, not independently verified on site. RERA unit details Floor plans
Carpet area describes the measured internal room area in the drawing analysis; the RERA-filed saleable area is a separate figure and may include the home’s share of common areas. The supplied drawing-measurement record says it needs review. The available information does not provide a RERA-filed carpet area or a unit-specific balcony/utility schedule. Floor plans RERA unit details
5. Parking & vehicle circulation
The HMDA technical approval shows one cellar level, but the supplied records do not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, parking layout, ramp arrangements, or unit-wise parking allocations. The vendor data mentions “Closed Car Parking” as a listed amenity; it does not provide a count or establish an allotment to a particular home. Promoter website
The approval also requires development of the approach road and master-plan road before release of occupancy certification. No evidence supplied here establishes the current condition of those roads, vehicle circulation within the site, or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
The RERA amenities record lists facilities and progress fields; where a percentage is shown, it is 0. “Available: YES” reflects the filed record, not independent verification of construction or operation. The HMDA approval also sets out specified site provisions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Size not supplied | RERA amenities record RERA amenities | “YES” in filing; no independent completion verification |
| Water conservation / rainwater harvesting | Size/capacity not supplied | RERA amenities record; HMDA approval RERA amenities | “YES” in filing; approval requires rainwater-harvesting structures; completion not verified |
| Community buildings | No description or size supplied | RERA amenities record RERA amenities | Progress recorded as 0%; no completion verification |
| Aggregate recreational open space | Area not supplied | RERA amenities record RERA amenities | Progress recorded as 0%; no completion verification |
| Internal roads and footpaths | Details not supplied | RERA amenities record RERA amenities | Progress recorded as 0% |
| Street lighting | Details not supplied | RERA amenities record RERA amenities | Progress recorded as 0% |
| Transformer | Capacity not supplied | HMDA approval | Approval requires provision; completion not verified |
| Garbage house | Size/capacity not supplied | HMDA approval | Approval requires provision; completion not verified |
The available evidence does not describe clubhouse or indoor-recreation facilities, sports facilities, or a convenience/community-facility schedule beyond the items above.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving-station item as “YES”; it does not provide capacities, design details or completed-service verification. The technical approval requires rainwater-harvesting structures, a transformer and garbage house, and records an ETP provision. RERA amenities
| Evidence in the supplied record | RERA amenities record lists Water Supply as “YES”. No source, storage capacity or treatment details supplied. RERA amenities |
|---|---|
| Status / limitation | Filed provision; operational status not verified |
| Evidence in the supplied record | RERA amenities record lists sewerage (chamber, lines, septic tank, STP) as “YES”; the HMDA approval identifies ETP. No capacity, reuse arrangement or completion evidence supplied. RERA amenities |
|---|---|
| Status / limitation | Filed/approval references only; not verified complete |
| Evidence in the supplied record | Storm Water Drains appears in the RERA amenities list; no design or capacity supplied. RERA amenities |
|---|---|
| Status / limitation | Progress recorded as 0% |
| Evidence in the supplied record | RERA amenities record lists electrical meter room, sub-station and receiving station as “YES”; HMDA approval requires a transformer. No capacity or backup-power details supplied. RERA amenities |
|---|---|
| Status / limitation | Provision recorded; completion not verified |
| Evidence in the supplied record | No lift count, type or capacity supplied. Document index |
|---|---|
| Status / limitation | Not disclosed in the supplied evidence |
| Evidence in the supplied record | HMDA approval requires compliance with Fire Service department norms as per Act 1999; RERA amenities list fire protection/fire-safety requirements. No fire clearance or completed-system evidence supplied. RERA amenities |
|---|---|
| Status / limitation | Requirement/listing only; compliance not established here |
| Evidence in the supplied record | HMDA approval requires a garbage house; RERA amenities list solid-waste management and disposal. No waste-system details supplied. RERA amenities |
|---|---|
| Status / limitation | Provision/listing only; completion not verified |
| Evidence in the supplied record | No ramp or accessible-circulation details supplied. Document index |
|---|---|
| Status / limitation | Not disclosed in the supplied evidence |
8. Location, access & connectivity
The RERA identity locates the project at KOLLUR ORRGC, Kollur village, RC PURAM mandal, Sangareddy district, PIN 502300. The HMDA technical approval describes the site as Kollur-ORRGC, Ramchandrapuram-ORRGC, Sanga Reddy district. RERA record RERA filing
The location record provides one sampled connectivity point: Outer Ring Road (nearest sampled interchange, approximate), 5.4 km. The approval refers to master-plan roads of 30.0mts and 36 mts and requires the approach road and master-plan road to be developed before release of occupancy certification. The supplied records do not give public-transport details, travel times, or measured distances to other landmarks. Location record
9. Developer & development status
The TG-RERA record names SUNSHINE CONSTRUCTIONS as the registered promoter and identifies its organization type as a partnership. The promoter’s GSTIN is 36ACHFS0041G1ZF. The RERA party record names Gottipati Srinivas as a partner and Madineni Ravikanth / Madineni Ravi Kanth as authorized signatory; a filed partnership-reconstitution document identifies Gottipati Srinivas and Madineni Ravi Kanth as continuing partners. RERA filing Corporate record Parties record
The Form-B affidavit, signed in Hyderabad on 05/11/2021, is a promoter declaration stating a completion undertaking of 07/05/2026, legal-title authentication and a development agreement, and commitments concerning approvals, project funds and audit. It is a filed declaration, not independent verification of those statements.
The project header gives proposed completion as 30/11/2026. The supplied evidence does not state a construction-progress percentage or verify physical progress. It records one building and does not identify separate tower-wise phases or completion/OC status for any portion. RERA record RERA filing RERA amenities
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | Form “C” for MADHURI AVAAS, registration P01100004076, issued 04/02/2022 and valid through 07/05/2026 unless extended; identifies Survey No. 193/E2. |
| Principal HMDA technical approval | Residential apartment building approval 036326/5KP/R1/U6/HMDA/08062020, dated 07/05/2021; Survey No. 193/e2; proposed cellar, ground floor and five upper floors; delegated local authority identified as Tellapur Municipality. |
| RERA-filed plan reference | Plan approval number recorded as 036326/SKP/R1/U6/HMD. RERA filing Approvals record |
| Title and development documents | Filed title material includes an advocate’s title search report, sale deeds, a development agreement-cum-GPA, a simple mortgage deed, and a public-utility gift deed. Document index |
| Form-B declaration | Promoter affidavit-cum-declaration dated 05/11/2021, including a completion undertaking of 07/05/2026. |
| Layout / floor-plan records | The supplied record includes a layout-plan filing entry without extracted plan content and a floor-plan source used for software measurement; no separate extracted approved-layout drawing is available here. Document index |
| Occupancy / completion certificate | None supplied in the evidence set. The HMDA technical approval states OC is compulsory before occupation. |
| Other project-specific official records | The supplied materials identify the RERA certificate and HMDA technical approval; no additional extracted utility, fire or completion certificates are included. Document index Approvals record |
1. Project at a glance
Project identity
Registered project name: MADHURI AVAAS
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; registration covers one building
TG-RERA registration: P01100004076
Registration validity: Issued 04/02/2022; stated to run through 07/05/2026, unless extended by the Authority. This is registration validity, not the construction completion date.
Registered promoter: SUNSHINE CONSTRUCTIONS; partnership
RERA status in supplied record: New Project; registration certificate supplied. No extension is recorded in the certificate data.
Land and geographic identity
Locality: KOLLUR ORRGC
Revenue village: KOLLUR; the filed approval also describes the location as Kollur-ORRGC / Kolluru Village.
Mandal: RC PURAM; the approval document states Ramchandrapuram-ORRGC.
District / PIN: Sangareddy / 502300
Survey number(s): 193/E2 (also written “193/e2” in the approval document)
Registered site extent: No single registered site-extent figure is identified in the supplied identity data. The RERA land record states total area 2008.17 sq m and net area 2008.17 sq m; affected area recorded as 0.
Approval-document extent: 1,013.13 Sq. Mt. is stated in the HMDA technical approval.
Boundaries in RERA land record: East: CTS NO; West: ROAD WIDTH 9; North: CTS NO; South: ROAD WIDTH 12.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval names Tellapur Municipality as the delegated local executive authority for sanction.
Principal filed plan approval number: 036326/SKP/R1/U6/HMD
HMDA technical approval number / date: 036326/5KP/R1/U6/HMDA/08062020, approved 07/05/2021.
Approved built-up area: 2755.98 sq m in the RERA project fields; the technical approval states “Built up Area 2756”.
Building count: One building; the technical approval labels it Residential A (PROP).
Sanctioned floor configuration: 1 Cellar + 1 Ground + 5 upper floors. Height stated in the approval parameters: 17.99 (unit not specified in the supplied extraction).
Parking levels / provision: One cellar is shown in the proposed floor configuration. A sanctioned parking count or parking allocation is not available in the supplied records.
Unit counts: 15 total units in the TG-RERA unit record; one approved building.
Offering and status
RERA-filed configuration: 3BHK; 15 units, 0 booked and 15 available in the portal record. The portal extract has no as-of date, so counts are indicative.
RERA-filed saleable area: 198.86 sq m per 3BHK configuration.
Construction stage: No construction-progress percentage or independently verified site-stage evidence is supplied. The RERA amenities record shows 0% for its listed progress fields; this does not establish physical site progress.
Completion dates: The registration certificate and Form-B declaration state 07/05/2026; the project header gives a proposed completion date of 30/11/2026.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The HMDA technical approval states that an Occupancy Certificate is compulsory before occupation.
2. The project story
MADHURI AVAAS is recorded with TG-RERA as a residential apartment project at Kollur, in the RC PURAM mandal, Sangareddy district, on Survey No. 193/E2. The filing describes one building and a 15-home 3BHK offering. The RERA unit record lists all 15 units as available and none as booked, but provides no booking-record as-of date.
The filed HMDA technical approval describes a proposed residential building with one cellar, a ground floor and five upper floors. It identifies a 1,013.13 Sq. Mt. extent and records requirements relating to the approach/master-plan road and occupancy certification. The available documents do not establish a current construction stage, completion of any part of the building, or an issued OC; physical progress has not been independently verified in this evidence set.
The RERA certificate records validity through 07/05/2026, while the project record also gives a proposed completion date of 30/11/2026. These are separate project fields: registration validity and the stated completion date are not interchangeable. No extension decision or occupancy certificate is included in the supplied materials.
3. Master plan, architecture & building design
The RERA record describes a 2008.17 sq m total and net land area, with 0 recorded as road-widening/FTL/nala-widening affected area in its land fields. The HMDA technical approval separately states an extent of 1,013.13 Sq. Mt. and approves building parameters including a built-up area of 2756 and a proposed configuration of 1 Cellar + 1 Ground + 5. The RERA filing states approved built-up area as 2755.98 sq m. These figures are reported as recorded; no area derivation is made here.
The approval describes one proposed residential building, block A (PROP), with a stated height of 17.99 (unit not specified in the extraction). The available materials do not provide a verified floor-by-floor unit schedule, building footprint, number of flats per floor, lift/stair details, internal circulation plan, landscaping plan, or phase-level organization. The RERA record gives one building and 15 units.
The filed technical approval identifies Transformer, Garbage house, ETP and rainwater-harvesting structures as provisions, and contains an approach-road/master-plan-road condition before release of OC. The supplied evidence does not establish that these works are complete. No FSI-counted area, carpet-area total for the project, or separately identified common-area area is available.
4. Homes, configurations & floor plans
The TG-RERA filing records 15 3BHK homes, with 0 booked and 15 available in the portal extract. The portal extract has no as-of date. Its saleable-area figure is 198.86 sq m. A software measurement from the supplied floor-plan drawing is reported separately below; it is not a RERA-filed carpet-area declaration and is identified as requiring review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 198.86 sq m | 155.9 sq m median (155.9 sq m min–max); software-measured from drawing, needs review | 22% (software-derived record) |
The measured drawing sample labels living/drawing, dining, kitchen, three bedrooms, toilets and a wash area. The sample lists room dimensions including living/drawing room 4.97 m × 5.82 m, dining 4.6 m × 5.82 m, and kitchen 2.92 m × 3.79 m. These are software-measured from drawing geometry, not independently verified on site.
Carpet area describes the measured internal room area in the drawing analysis; the RERA-filed saleable area is a separate figure and may include the home’s share of common areas. The supplied drawing-measurement record says it needs review. The available information does not provide a RERA-filed carpet area or a unit-specific balcony/utility schedule.
5. Parking & vehicle circulation
The HMDA technical approval shows one cellar level, but the supplied records do not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, parking layout, ramp arrangements, or unit-wise parking allocations. The vendor data mentions “Closed Car Parking” as a listed amenity; it does not provide a count or establish an allotment to a particular home.
The approval also requires development of the approach road and master-plan road before release of occupancy certification. No evidence supplied here establishes the current condition of those roads, vehicle circulation within the site, or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
The RERA amenities record lists facilities and progress fields; where a percentage is shown, it is 0. “Available: YES” reflects the filed record, not independent verification of construction or operation. The HMDA approval also sets out specified site provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Size not supplied | RERA amenities record | “YES” in filing; no independent completion verification |
| Water conservation / rainwater harvesting | Size/capacity not supplied | RERA amenities record; HMDA approval | “YES” in filing; approval requires rainwater-harvesting structures; completion not verified |
| Community buildings | No description or size supplied | RERA amenities record | Progress recorded as 0%; no completion verification |
| Aggregate recreational open space | Area not supplied | RERA amenities record | Progress recorded as 0%; no completion verification |
| Internal roads and footpaths | Details not supplied | RERA amenities record | Progress recorded as 0% |
| Street lighting | Details not supplied | RERA amenities record | Progress recorded as 0% |
| Transformer | Capacity not supplied | HMDA approval | Approval requires provision; completion not verified |
| Garbage house | Size/capacity not supplied | HMDA approval | Approval requires provision; completion not verified |
The available evidence does not describe clubhouse or indoor-recreation facilities, sports facilities, or a convenience/community-facility schedule beyond the items above.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving-station item as “YES”; it does not provide capacities, design details or completed-service verification. The technical approval requires rainwater-harvesting structures, a transformer and garbage house, and records an ETP provision.
| Evidence in the supplied record | RERA amenities record lists Water Supply as “YES”. No source, storage capacity or treatment details supplied. |
|---|---|
| Status / limitation | Filed provision; operational status not verified |
| Evidence in the supplied record | RERA amenities record lists sewerage (chamber, lines, septic tank, STP) as “YES”; the HMDA approval identifies ETP. No capacity, reuse arrangement or completion evidence supplied. |
|---|---|
| Status / limitation | Filed/approval references only; not verified complete |
| Evidence in the supplied record | Storm Water Drains appears in the RERA amenities list; no design or capacity supplied. |
|---|---|
| Status / limitation | Progress recorded as 0% |
| Evidence in the supplied record | RERA amenities record lists electrical meter room, sub-station and receiving station as “YES”; HMDA approval requires a transformer. No capacity or backup-power details supplied. |
|---|---|
| Status / limitation | Provision recorded; completion not verified |
| Evidence in the supplied record | No lift count, type or capacity supplied. |
|---|---|
| Status / limitation | Not disclosed in the supplied evidence |
| Evidence in the supplied record | HMDA approval requires compliance with Fire Service department norms as per Act 1999; RERA amenities list fire protection/fire-safety requirements. No fire clearance or completed-system evidence supplied. |
|---|---|
| Status / limitation | Requirement/listing only; compliance not established here |
| Evidence in the supplied record | HMDA approval requires a garbage house; RERA amenities list solid-waste management and disposal. No waste-system details supplied. |
|---|---|
| Status / limitation | Provision/listing only; completion not verified |
| Evidence in the supplied record | No ramp or accessible-circulation details supplied. |
|---|---|
| Status / limitation | Not disclosed in the supplied evidence |
8. Location, access & connectivity
The RERA identity locates the project at KOLLUR ORRGC, Kollur village, RC PURAM mandal, Sangareddy district, PIN 502300. The HMDA technical approval describes the site as Kollur-ORRGC, Ramchandrapuram-ORRGC, Sanga Reddy district.
The location record provides one sampled connectivity point: Outer Ring Road (nearest sampled interchange, approximate), 5.4 km. The approval refers to master-plan roads of 30.0mts and 36 mts and requires the approach road and master-plan road to be developed before release of occupancy certification. The supplied records do not give public-transport details, travel times, or measured distances to other landmarks.
9. Developer & development status
The TG-RERA record names SUNSHINE CONSTRUCTIONS as the registered promoter and identifies its organization type as a partnership. The promoter’s GSTIN is 36ACHFS0041G1ZF. The RERA party record names Gottipati Srinivas as a partner and Madineni Ravikanth / Madineni Ravi Kanth as authorized signatory; a filed partnership-reconstitution document identifies Gottipati Srinivas and Madineni Ravi Kanth as continuing partners.
The Form-B affidavit, signed in Hyderabad on 05/11/2021, is a promoter declaration stating a completion undertaking of 07/05/2026, legal-title authentication and a development agreement, and commitments concerning approvals, project funds and audit. It is a filed declaration, not independent verification of those statements.
The project header gives proposed completion as 30/11/2026. The supplied evidence does not state a construction-progress percentage or verify physical progress. It records one building and does not identify separate tower-wise phases or completion/OC status for any portion.
10. Approvals, official records & documents
TG-RERA registration: Form “C” for MADHURI AVAAS, registration P01100004076, issued 04/02/2022 and valid through 07/05/2026 unless extended; identifies Survey No. 193/E2.
Principal HMDA technical approval: Residential apartment building approval 036326/5KP/R1/U6/HMDA/08062020, dated 07/05/2021; Survey No. 193/e2; proposed cellar, ground floor and five upper floors; delegated local authority identified as Tellapur Municipality.
RERA-filed plan reference: Plan approval number recorded as 036326/SKP/R1/U6/HMD.
Title and development documents: Filed title material includes an advocate’s title search report, sale deeds, a development agreement-cum-GPA, a simple mortgage deed, and a public-utility gift deed.
Form-B declaration: Promoter affidavit-cum-declaration dated 05/11/2021, including a completion undertaking of 07/05/2026.
Layout / floor-plan records: The supplied record includes a layout-plan filing entry without extracted plan content and a floor-plan source used for software measurement; no separate extracted approved-layout drawing is available here.
Occupancy / completion certificate: None supplied in the evidence set. The HMDA technical approval states OC is compulsory before occupation.
Other project-specific official records: The supplied materials identify the RERA certificate and HMDA technical approval; no additional extracted utility, fire or completion certificates are included.
Frequently asked questions
Is MADHURI AVAAS registered with Telangana RERA?
Yes. MADHURI AVAAS is registered with the Telangana Real Estate Regulatory Authority as P01100004076; the registration status is New Project.
Who is the developer of MADHURI AVAAS?
The promoter named in the RERA registration is SUNSHINE CONSTRUCTIONS.
Where is MADHURI AVAAS located?
MADHURI AVAAS is in KOLLUR ORRGC, KOLLUR, RC PURAM, Sangareddy, Telangana (502300).
When will MADHURI AVAAS be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.
More projects in Kollur