Vasavi Vijay Vihar
VASAVI REALTY AND DEVELOPERS LLP · Mahabubnagar · RERA P01400010779
VASAVI VIJAY VIHAR is a plotted development in Udithyal, Balanagar Mandal, Mahabubnagar District, developed by the registered promoter VASAVI REALTY AND DEVELOPERS LLP. The revised HMDA draft layout record states a net layout extent of 183495.28 Sqmt and a schedule of 462 plots; the project is for open plots, with plot sizes from 150.5 sq.m (180.0 sqyd) to 916.53 sq.m (1096.2 sqyd). Its TG-RERA registration is P01400010779, and the project header states proposed completion 12/04/2029.
More from Vasavi Realty And Developers LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project | VASAVI VIJAY VIHAR RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | A registered plotted-layout project; a separate phase designation is not disclosed. RERA record |
| TG-RERA registration | P01400010779; Form C records validity from 12/12/2025 to 12/12/2028. Registration validity is distinct from the completion undertaking and occupancy/completion certification. RERA record |
| Registered promoter | VASAVI REALTY AND DEVELOPERS LLP RERA record Corporate record |
| RERA status | Registered; the certificate’s stated validity period is as above. Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Revenue village | Udithyal, Balanagar Mandal, Mahabubnagar District; PIN 509202. RERA record |
| Locality | Udithyal, Balanagar Mandal. RERA record RERA filing |
| Project survey numbers / subdivisions as filed | 496, 510 PART, 530 PART, 535 PART, 497 PART, 498 PART, 504 PART, 505 PART, 506 PART, 507 PART, 508 PART, 509 PART. RERA record |
| Registered site area | RERA land details state total area 171868.24 sqmts, affected area 4169.02 sqmts, and net area 167699.22 sqmts. RERA filing |
| Layout area in revised HMDA record | The revised draft layout record states a net layout extent of 183495.28 Sqmt. |
| Boundaries | East: 33FT WIDE EXISTING ROAD; West: OTHERS LAND; North: OTHERS LAND; South: MAIN ROAD 18M EXISTING AND 30M PROPOSED ROAD WIDTH. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); draft layout permission is delegated to the relevant local body for release of proceedings and plans. |
| Principal approval on RERA filing | 1218/HMDA/SWDL/2025, dated 12/12/2025; filed as the plan approval. Approvals record |
| Revised draft layout record | 2612/HMDA/SWDL/2026, dated 17/10/2026. Approvals record |
| Approved built-up area | RERA filing states 86803.85 sqmts. RERA filing |
| Buildings / floors | Not applicable as a plotted layout; no building count or floor configuration for homes is disclosed in the supplied RERA record. RERA filing |
| Parking | HMDA land-use schedule records 0.0 common parking area; a count of individual plot parking spaces is not disclosed. |
| Approved versus RERA-declared plots | Revised layout drawing-derived schedule: 462 plots; the filed blank Agreement for Sale template describes 434 plots. These are identified here by their respective record sources, not treated as a reconciled count. Layout record |
Offering and status
| Item | Record |
|---|---|
| Offering | Open plots. A RERA-filed blank allotment-letter form identifies plot allotment; no completed plot-specific allotment is supplied. |
| Plot count and sizes | Layout schedule, software-read from the drawing: 462 plots; smallest 150.5 sq.m (180.0 sqyd), median 167.23 sq.m (200.0 sqyd), largest 916.53 sq.m (1096.2 sqyd). Verify against the drawing. Layout record |
| Booked / available | Not disclosed in the supplied project record. RERA filing |
| Development stage | RERA status is “New Project.” The RERA-filed amenity progress entry reports internal roads and footpaths at 30% and other listed items at 0%; this is promoter-reported progress, not independent site verification. RERA record RERA amenities |
| Completion timeline | Form B undertaking states completion by 12 December 2028; the project header records proposed completion 12/04/2029. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. For this plotted project, the supplied records instead describe draft layout permission and conditions precedent to final layout release. Document index |
2. The project story
VASAVI VIJAY VIHAR is presented in the TG-RERA record as a plotted development at Udithyal village in Balanagar Mandal, Mahabubnagar District. The registered offering is open plots, not apartment units or a completed building. The project’s filed identity covers the listed survey numbers and part-survey subdivisions in the identity table above. RERA record RERA filing
HMDA’s December 2025 record is a draft layout letter for a net extent of 167699.22 Sqmt. A later HMDA revised draft layout record dated 17 October 2026 gives a net layout extent of 183495.28 Sqmt and a revised land-use schedule. Both records describe layout development and require further works and local-body handover before final layout release; they are not evidence that those works or final release have occurred.
The RERA-filed declaration undertakes completion by 12 December 2028, while the project header states proposed completion as 12/04/2029. No independently verified construction or site-completion assessment is supplied. The RERA progress figures are promoter-reported and should not be read as an independent inspection. RERA record RERA amenities
3. Master plan, architecture & building design
The project is organized as a plotted layout. The revised HMDA draft layout record gives a total net layout area of 183495.28 Sqmt and this land-use schedule:
| Layout use | Area | Share stated in record |
|---|---|---|
| Plotted Area | 99207.96 | 54.07% |
| Road Area | 57721.5 | 31.46% |
| Open Space Area | 17037.33 | 9.28% |
| Buffer Area | 2958.15 | 1.61% |
| Social Infrastructure Area | 4775.75 | 2.60% |
| Utilities Area | 1793.28 | 0.98% |
| Common Parking Area | 0.0 | 0.0% |
| Amenities Area | 0 | 0.0% |
| Green Belt Area | 0 | 0.0% |
The layout drawing schedule, read by software, records 462 plots and a plot-area total of 99207.96 sq.m. The drawing-derived layout record also lists 57721.5 sq.m of roads, 17037.33 sq.m of parks/open space, 1793.28 sq.m of utilities and 4775.75 sq.m of social infrastructure. These are drawing-derived figures and should be checked against the approved drawing. Layout record
The revised draft layout identifies buffer area and requires specified layout roads, open space, buffer, social-infrastructure and utility areas to be handed over to the local body by registered gift deed before release of final layout plans. It records a prior gift deed for road-affected area, but does not establish completion of all development works or final layout release.
Road widths listed in the layout approval material include 18 mts and above; the earlier layout drawing extraction also lists 33'-0", 9.14m, 9m, 18m, 30m, 12.19m, 9.07m, 9.13m, 9.32m, 18.29m, 10.13m and 16.39m. The drawing annotations identify a cycling track, nala/buffer features and a road-widening area.
The RERA filing states approved built-up area of 86803.85 sqmts. That figure is reported as approved built-up area; it is not a plot area, saleable area or carpet area. The supplied material does not specify buildings, floors, tower heights, or residential building arrangements. RERA filing
4. Homes, configurations & floor plans
This is a plotted project. No RERA unit-type schedule with booked or available unit counts, and no plot-by-plot RERA saleable-area schedule, is supplied. The RERA-filed Agreement for Sale template refers to 434 plots, while the layout drawing schedule read by software records 462 plots; refer to the evidence index and have the applicable plot schedule confirmed for the specific purchase. Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 434 in the filed Agreement for Sale template | Not disclosed | Not disclosed | Not disclosed by plot | Not applicable | Not supplied |
The software-read layout schedule gives plot sizes from 150.5 sq.m (180.0 sqyd) to 916.53 sq.m (1096.2 sqyd), with a median of 167.23 sq.m (200.0 sqyd). Its size bands are: Layout record
| Plot-size band | Number of plots |
|---|---|
| 150–200 sqyd | 111 |
| 200–250 sqyd | 250 |
| 250–300 sqyd | 11 |
| 300–400 sqyd | 53 |
| 400–500 sqyd | 7 |
| 500–1000 sqyd | 28 |
| 1000+ sqyd | 2 |
These drawing-derived plot counts and areas are software-read and require verification against the layout drawing. The supplied floor-plan record contains no building floor plans or measured homes. Layout record Floor plans
5. Parking & vehicle circulation
The revised HMDA land-use schedule records 0.0 common parking area. It does not provide a count of parking spaces within individual plots, visitor parking, accessible parking, or a unit-specific parking allocation.
The layout approval material identifies internal roads and footpaths, and the drawing annotations include multiple road widths and a cycling track. The supplied documents do not specify vehicle-entry/exit arrangements, driveway dimensions, pedestrian separation details, EV charging, or a legally documented parking allocation for any particular plot.
6. Amenities, recreation & open spaces
The revised HMDA draft layout schedule identifies open space, social infrastructure and utilities as separate land uses. Listed layout infrastructure and facilities below are drawn from the RERA-filed amenity schedule and HMDA layout records; the record does not independently verify completion unless progress is specifically stated. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / open space | 17037.33 sq.m in revised layout schedule | Layout record | RERA amenity entry says available “YES,” progress 0%; not independently verified complete. RERA amenities |
| Social infrastructure | 4775.75 sq.m in revised layout schedule | Handover to local body is required before final layout release; completion not verified. | |
| Cycling track | Drawing annotation identifies a 2.M WIDE CYCLING TRACK | No completion status supplied. | |
| Internal roads and footpaths | Layout infrastructure | RERA amenities | RERA amenity entry reports 30%; promoter-reported, not independently verified. |
| Street lighting | Listed as layout infrastructure | RERA amenities | RERA amenity entry reports 0%; not independently verified. |
| Avenue plantation | Listed in HMDA layout material | No completion status supplied. | |
| Community buildings | RERA amenity schedule lists community buildings | RERA amenities | RERA entry reports 0%; no size or completed status supplied. |
The supplied amenity schedule does not identify a clubhouse or indoor recreation facility with a stated size or capacity. RERA amenities The project’s site utilities and services are summarized in the next section.
7. Utilities, building services & safety
HMDA draft-layout material lists proposed layout services and infrastructure, including water supply lines, overhead tank, sumps, protected water supply, storm-water drains, underground drainage, common septic tank/STP, independent sewerage disposal, rainwater-harvesting pits, electrical supply lines, transformer/transformer yard, street lights, solid-waste disposal and a bio-compost unit. These are listed provisions, not evidence of completed or operational systems.
| Evidence in project record | Internal water-supply lines, overhead tank, sumps and protected water supply are listed. |
|---|---|
| Status / limits | Source, storage capacity and treatment capacity are not disclosed; RERA amenity schedule reports water supply at 0%. RERA amenities |
| Evidence in project record | Storm-water drains, underground drainage lines, common septic tank/STP, independent sewerage disposal and sewage/sullage treatment are listed. |
|---|---|
| Status / limits | Capacity, operating status and reuse arrangements are not disclosed; RERA amenity entries report 0%. RERA amenities |
| Evidence in project record | Electrical supply lines, transformer and transformer yard are listed. |
|---|---|
| Status / limits | Capacity, backup power and operational status are not disclosed. |
| Evidence in project record | Rainwater-harvesting pits are listed. |
|---|---|
| Status / limits | Capacity and completed status are not disclosed. |
| Evidence in project record | Solid-waste disposal/dumping space and bio-compost unit are listed. |
|---|---|
| Status / limits | Capacity and completed status are not disclosed. |
| Evidence in project record | Fire protection and fire-safety requirements appear in the RERA amenity schedule. RERA amenities |
|---|---|
| Status / limits | Specific systems, clearances, implementation and progress are not supplied. |
| Evidence in project record | Internal roads and footpaths are listed; cycling track is annotated on the layout drawing. |
|---|---|
| Status / limits | Accessible-route details and separation of pedestrian and vehicle circulation are not supplied. |
No lift, building-level fire-system, CCTV, gate-access, or other residential-building service details are supplied for this plotted development.
8. Location, access & connectivity
The registered project location is Udithyal, Balanagar Mandal, Mahabubnagar District, Telangana, 509202. The land record gives a cadastral parcel centroid of 16.96881688817235, 78.13115837114829; this is a parcel reference, not an independently surveyed project entrance. RERA record Cadastral map
The project boundary description identifies a 33FT WIDE EXISTING ROAD to the east and a MAIN ROAD 18M EXISTING AND 30M PROPOSED ROAD WIDTH to the south. The layout approval material also lists internal roads and road widths. RERA filing
The supplied location record gives Outer Ring Road (nearest sampled interchange, approx): 43.0 km and SubCentre Udithyala: 1.9 km. These are recorded distances; no travel times or public-transport details are supplied. Location record
9. Developer & development status
The registered legal promoter is VASAVI REALTY AND DEVELOPERS LLP, an LLP, with GSTIN 36AATFV8296Q1ZM. The supplied promoter address is NORTH END ANILATHMAJA HOUSING SOCIETY, ROAD NO 2, Udithyal Village, Balanagar Mandal, Balanagar, Mahabubnagar, 509202. Corporate record Parties record
The RERA-filed Form B affidavit is signed by CHANDA ABHISHEK, identified as authorized signatory, and dated 13.12.2025. It undertakes completion by 12 December 2028. The project header separately lists proposed completion as 12/04/2029. RERA record
The RERA certificate requires quarterly updates. The supplied progress schedule reports internal roads and footpaths at 30%, with other listed amenity items at 0%; these are promoter-reported figures, not independent verification of site progress. No project contact telephone, email, or official website is supplied. RERA amenities
10. Approvals, official records & documents
| Record | Evidence and scope |
|---|---|
| TG-RERA registration certificate | Form C for VASAVI VIJAY VIHAR, registration P01400010779, promoter VASAVI REALTY AND DEVELOPERS LLP, stated validity 12/12/2025–12/12/2028. |
| HMDA draft layout letter | 1218/HMDA/SWDL/2025, dated 12/12/2025, for the Udithyal plotted layout; document states that the permission is not proof of title and that development works and handover requirements apply before final layout release. |
| HMDA revised draft layout letter | 2612/HMDA/SWDL/2026, dated 17/10/2026, with a revised net layout extent of 183495.28 Sqmt, a revised land-use schedule and conditions concerning handover before final layout release. |
| HMDA application references | 006227/HMDA/01878/SWDL/SKP1/2025 for the earlier draft-layout record; 017427/HMDA/04432/SWDL/SKP1/2026-ADD for the revised application. |
| RERA-filed Form B declaration | Promoter declaration dated 13.12.2025, including the completion undertaking and project-account commitments. |
| RERA-filed sale forms | Blank plot allotment-letter form and Agreement for Sale template; neither is a completed allotment or conveyance for a buyer’s specific plot. |
| HMDA portal record | Public HMDA DPMS approved-layout lookup was unavailable in the supplied evidence; the record notes the portal was not publicly reachable. This is an access limitation, not evidence of refusal. HMDA |
| Occupancy/completion certificate | No project occupancy or completion certificate is identified in the supplied documents. Document index |
1. Project at a glance
Project identity
Registered project: VASAVI VIJAY VIHAR
Project type: Plotted development
Phase / registered portion: A registered plotted-layout project; a separate phase designation is not disclosed.
TG-RERA registration: P01400010779; Form C records validity from 12/12/2025 to 12/12/2028. Registration validity is distinct from the completion undertaking and occupancy/completion certification.
Registered promoter: VASAVI REALTY AND DEVELOPERS LLP
RERA status: Registered; the certificate’s stated validity period is as above.
Land and geographic identity
Revenue village: Udithyal, Balanagar Mandal, Mahabubnagar District; PIN 509202.
Locality: Udithyal, Balanagar Mandal.
Project survey numbers / subdivisions as filed: 496, 510 PART, 530 PART, 535 PART, 497 PART, 498 PART, 504 PART, 505 PART, 506 PART, 507 PART, 508 PART, 509 PART.
Registered site area: RERA land details state total area 171868.24 sqmts, affected area 4169.02 sqmts, and net area 167699.22 sqmts.
Layout area in revised HMDA record: The revised draft layout record states a net layout extent of 183495.28 Sqmt.
Boundaries: East: 33FT WIDE EXISTING ROAD; West: OTHERS LAND; North: OTHERS LAND; South: MAIN ROAD 18M EXISTING AND 30M PROPOSED ROAD WIDTH.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); draft layout permission is delegated to the relevant local body for release of proceedings and plans.
Principal approval on RERA filing: 1218/HMDA/SWDL/2025, dated 12/12/2025; filed as the plan approval.
Revised draft layout record: 2612/HMDA/SWDL/2026, dated 17/10/2026.
Approved built-up area: RERA filing states 86803.85 sqmts.
Buildings / floors: Not applicable as a plotted layout; no building count or floor configuration for homes is disclosed in the supplied RERA record.
Parking: HMDA land-use schedule records 0.0 common parking area; a count of individual plot parking spaces is not disclosed.
Approved versus RERA-declared plots: Revised layout drawing-derived schedule: 462 plots; the filed blank Agreement for Sale template describes 434 plots. These are identified here by their respective record sources, not treated as a reconciled count.
Offering and status
Offering: Open plots. A RERA-filed blank allotment-letter form identifies plot allotment; no completed plot-specific allotment is supplied.
Plot count and sizes: Layout schedule, software-read from the drawing: 462 plots; smallest 150.5 sq.m (180.0 sqyd), median 167.23 sq.m (200.0 sqyd), largest 916.53 sq.m (1096.2 sqyd). Verify against the drawing.
Booked / available: Not disclosed in the supplied project record.
Development stage: RERA status is “New Project.” The RERA-filed amenity progress entry reports internal roads and footpaths at 30% and other listed items at 0%; this is promoter-reported progress, not independent site verification.
Completion timeline: Form B undertaking states completion by 12 December 2028; the project header records proposed completion 12/04/2029.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. For this plotted project, the supplied records instead describe draft layout permission and conditions precedent to final layout release.
2. The project story
VASAVI VIJAY VIHAR is presented in the TG-RERA record as a plotted development at Udithyal village in Balanagar Mandal, Mahabubnagar District. The registered offering is open plots, not apartment units or a completed building. The project’s filed identity covers the listed survey numbers and part-survey subdivisions in the identity table above.
HMDA’s December 2025 record is a draft layout letter for a net extent of 167699.22 Sqmt. A later HMDA revised draft layout record dated 17 October 2026 gives a net layout extent of 183495.28 Sqmt and a revised land-use schedule. Both records describe layout development and require further works and local-body handover before final layout release; they are not evidence that those works or final release have occurred.
The RERA-filed declaration undertakes completion by 12 December 2028, while the project header states proposed completion as 12/04/2029. No independently verified construction or site-completion assessment is supplied. The RERA progress figures are promoter-reported and should not be read as an independent inspection.
3. Master plan, architecture & building design
The project is organized as a plotted layout. The revised HMDA draft layout record gives a total net layout area of 183495.28 Sqmt and this land-use schedule:
| Layout use | Area | Share stated in record |
|---|---|---|
| Plotted Area | 99207.96 | 54.07% |
| Road Area | 57721.5 | 31.46% |
| Open Space Area | 17037.33 | 9.28% |
| Buffer Area | 2958.15 | 1.61% |
| Social Infrastructure Area | 4775.75 | 2.60% |
| Utilities Area | 1793.28 | 0.98% |
| Common Parking Area | 0.0 | 0.0% |
| Amenities Area | 0 | 0.0% |
| Green Belt Area | 0 | 0.0% |
The layout drawing schedule, read by software, records 462 plots and a plot-area total of 99207.96 sq.m. The drawing-derived layout record also lists 57721.5 sq.m of roads, 17037.33 sq.m of parks/open space, 1793.28 sq.m of utilities and 4775.75 sq.m of social infrastructure. These are drawing-derived figures and should be checked against the approved drawing.
The revised draft layout identifies buffer area and requires specified layout roads, open space, buffer, social-infrastructure and utility areas to be handed over to the local body by registered gift deed before release of final layout plans. It records a prior gift deed for road-affected area, but does not establish completion of all development works or final layout release.
Road widths listed in the layout approval material include 18 mts and above; the earlier layout drawing extraction also lists 33'-0", 9.14m, 9m, 18m, 30m, 12.19m, 9.07m, 9.13m, 9.32m, 18.29m, 10.13m and 16.39m. The drawing annotations identify a cycling track, nala/buffer features and a road-widening area.
The RERA filing states approved built-up area of 86803.85 sqmts. That figure is reported as approved built-up area; it is not a plot area, saleable area or carpet area. The supplied material does not specify buildings, floors, tower heights, or residential building arrangements.
4. Homes, configurations & floor plans
This is a plotted project. No RERA unit-type schedule with booked or available unit counts, and no plot-by-plot RERA saleable-area schedule, is supplied. The RERA-filed Agreement for Sale template refers to 434 plots, while the layout drawing schedule read by software records 462 plots; refer to the evidence index and have the applicable plot schedule confirmed for the specific purchase.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 434 in the filed Agreement for Sale template | Not disclosed | Not disclosed | Not disclosed by plot | Not applicable | Not supplied |
The software-read layout schedule gives plot sizes from 150.5 sq.m (180.0 sqyd) to 916.53 sq.m (1096.2 sqyd), with a median of 167.23 sq.m (200.0 sqyd). Its size bands are:
150–200 sqyd: 111
200–250 sqyd: 250
250–300 sqyd: 11
300–400 sqyd: 53
400–500 sqyd: 7
500–1000 sqyd: 28
1000+ sqyd: 2
These drawing-derived plot counts and areas are software-read and require verification against the layout drawing. The supplied floor-plan record contains no building floor plans or measured homes.
5. Parking & vehicle circulation
The revised HMDA land-use schedule records 0.0 common parking area. It does not provide a count of parking spaces within individual plots, visitor parking, accessible parking, or a unit-specific parking allocation.
The layout approval material identifies internal roads and footpaths, and the drawing annotations include multiple road widths and a cycling track. The supplied documents do not specify vehicle-entry/exit arrangements, driveway dimensions, pedestrian separation details, EV charging, or a legally documented parking allocation for any particular plot.
6. Amenities, recreation & open spaces
The revised HMDA draft layout schedule identifies open space, social infrastructure and utilities as separate land uses. Listed layout infrastructure and facilities below are drawn from the RERA-filed amenity schedule and HMDA layout records; the record does not independently verify completion unless progress is specifically stated.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Parks / open space | 17037.33 sq.m in revised layout schedule | RERA amenity entry says available “YES,” progress 0%; not independently verified complete. | |
| Social infrastructure | 4775.75 sq.m in revised layout schedule | Handover to local body is required before final layout release; completion not verified. | |
| Cycling track | Drawing annotation identifies a 2.M WIDE CYCLING TRACK | No completion status supplied. | |
| Internal roads and footpaths | Layout infrastructure | RERA amenity entry reports 30%; promoter-reported, not independently verified. | |
| Street lighting | Listed as layout infrastructure | RERA amenity entry reports 0%; not independently verified. | |
| Avenue plantation | Listed in HMDA layout material | No completion status supplied. | |
| Community buildings | RERA amenity schedule lists community buildings | RERA entry reports 0%; no size or completed status supplied. |
The supplied amenity schedule does not identify a clubhouse or indoor recreation facility with a stated size or capacity. The project’s site utilities and services are summarized in the next section.
7. Utilities, building services & safety
HMDA draft-layout material lists proposed layout services and infrastructure, including water supply lines, overhead tank, sumps, protected water supply, storm-water drains, underground drainage, common septic tank/STP, independent sewerage disposal, rainwater-harvesting pits, electrical supply lines, transformer/transformer yard, street lights, solid-waste disposal and a bio-compost unit. These are listed provisions, not evidence of completed or operational systems.
| Evidence in project record | Internal water-supply lines, overhead tank, sumps and protected water supply are listed. |
|---|---|
| Status / limits | Source, storage capacity and treatment capacity are not disclosed; RERA amenity schedule reports water supply at 0%. |
| Evidence in project record | Storm-water drains, underground drainage lines, common septic tank/STP, independent sewerage disposal and sewage/sullage treatment are listed. |
|---|---|
| Status / limits | Capacity, operating status and reuse arrangements are not disclosed; RERA amenity entries report 0%. |
| Evidence in project record | Electrical supply lines, transformer and transformer yard are listed. |
|---|---|
| Status / limits | Capacity, backup power and operational status are not disclosed. |
| Evidence in project record | Rainwater-harvesting pits are listed. |
|---|---|
| Status / limits | Capacity and completed status are not disclosed. |
| Evidence in project record | Solid-waste disposal/dumping space and bio-compost unit are listed. |
|---|---|
| Status / limits | Capacity and completed status are not disclosed. |
| Evidence in project record | Fire protection and fire-safety requirements appear in the RERA amenity schedule. |
|---|---|
| Status / limits | Specific systems, clearances, implementation and progress are not supplied. |
| Evidence in project record | Internal roads and footpaths are listed; cycling track is annotated on the layout drawing. |
|---|---|
| Status / limits | Accessible-route details and separation of pedestrian and vehicle circulation are not supplied. |
No lift, building-level fire-system, CCTV, gate-access, or other residential-building service details are supplied for this plotted development.
8. Location, access & connectivity
The registered project location is Udithyal, Balanagar Mandal, Mahabubnagar District, Telangana, 509202. The land record gives a cadastral parcel centroid of 16.96881688817235, 78.13115837114829; this is a parcel reference, not an independently surveyed project entrance.
The project boundary description identifies a 33FT WIDE EXISTING ROAD to the east and a MAIN ROAD 18M EXISTING AND 30M PROPOSED ROAD WIDTH to the south. The layout approval material also lists internal roads and road widths.
The supplied location record gives Outer Ring Road (nearest sampled interchange, approx): 43.0 km and SubCentre Udithyala: 1.9 km. These are recorded distances; no travel times or public-transport details are supplied.
9. Developer & development status
The registered legal promoter is VASAVI REALTY AND DEVELOPERS LLP, an LLP, with GSTIN 36AATFV8296Q1ZM. The supplied promoter address is NORTH END ANILATHMAJA HOUSING SOCIETY, ROAD NO 2, Udithyal Village, Balanagar Mandal, Balanagar, Mahabubnagar, 509202.
The RERA-filed Form B affidavit is signed by CHANDA ABHISHEK, identified as authorized signatory, and dated 13.12.2025. It undertakes completion by 12 December 2028. The project header separately lists proposed completion as 12/04/2029.
The RERA certificate requires quarterly updates. The supplied progress schedule reports internal roads and footpaths at 30%, with other listed amenity items at 0%; these are promoter-reported figures, not independent verification of site progress. No project contact telephone, email, or official website is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for VASAVI VIJAY VIHAR, registration P01400010779, promoter VASAVI REALTY AND DEVELOPERS LLP, stated validity 12/12/2025–12/12/2028.
HMDA draft layout letter: 1218/HMDA/SWDL/2025, dated 12/12/2025, for the Udithyal plotted layout; document states that the permission is not proof of title and that development works and handover requirements apply before final layout release.
HMDA revised draft layout letter: 2612/HMDA/SWDL/2026, dated 17/10/2026, with a revised net layout extent of 183495.28 Sqmt, a revised land-use schedule and conditions concerning handover before final layout release.
HMDA application references: 006227/HMDA/01878/SWDL/SKP1/2025 for the earlier draft-layout record; 017427/HMDA/04432/SWDL/SKP1/2026-ADD for the revised application.
RERA-filed Form B declaration: Promoter declaration dated 13.12.2025, including the completion undertaking and project-account commitments.
RERA-filed sale forms: Blank plot allotment-letter form and Agreement for Sale template; neither is a completed allotment or conveyance for a buyer’s specific plot.
HMDA portal record: Public HMDA DPMS approved-layout lookup was unavailable in the supplied evidence; the record notes the portal was not publicly reachable. This is an access limitation, not evidence of refusal.
Occupancy/completion certificate: No project occupancy or completion certificate is identified in the supplied documents.
Frequently asked questions
Is VASAVI VIJAY VIHAR registered with Telangana RERA?
Yes. VASAVI VIJAY VIHAR is registered with the Telangana Real Estate Regulatory Authority as P01400010779; the registration status is New Project.
Who is the developer of VASAVI VIJAY VIHAR?
The promoter named in the RERA registration is VASAVI REALTY AND DEVELOPERS LLP.
Where is VASAVI VIJAY VIHAR located?
VASAVI VIJAY VIHAR is in Balanagar Mandal, Udithyal, Balanagar, Mahabubnagar, Telangana (509202).
When will VASAVI VIJAY VIHAR be completed?
The promoter's proposed date of completion filed with RERA is 12/04/2029. This is the promoter's declaration, not a guarantee.