Ace Centrum
ACE SS INFRA · Rangareddy · RERA P02400011408
ACE CENTRUM is a commercial project offering SHOP units in WARD NO 3, BLOCK NO 2, BAHADURGUA, Saroornagar Mandal, Ranga Reddy District. The registered promoter is ACE SS INFRA. The project covers a total site area of 3900.25 sq. m and comprises one building with 2 Cellars + Ground Floor + 4 Floors, containing 65 SHOP units with a filed saleable area of 202.32 sq. m per unit. It is registered under TG-RERA number P02400011408, with a proposed completion date of 03/02/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | ACE CENTRUM |
| Project type | Commercial; the RERA filing lists the offered units as SHOP. RERA record RERA unit details |
| Phase / registered portion | Phase not separately identified in the supplied record. RERA record |
| TG-RERA registration number | P02400011408 |
| Registration validity | 03/02/2026 to 03/02/2029; the certificate states a three-year registration period. This is the registration validity, not a completion certificate. |
| Registered promoter | ACE SS INFRA |
| RERA status | RERA-recorded status is On-Going Project; registration certificate issued 06/11/2026. RERA record |
Land and geographic identity
| Item | TG-RERA / filed record |
|---|---|
| Locality | WARD NO 3, BLOCK NO 2, BAHADURGUA RERA filing |
| Revenue village | Bahadurguda RERA filing |
| Mandal | Saroornagar RERA filing |
| District | Ranga Reddy RERA filing |
| PIN | 500074 RERA filing |
| Project survey numbers | SY NO 9/1 and 9/2 RERA filing |
| Site extent | Total area 3900.25 sq. m; area affected by road widening/FTL of tanks/nala widening 605.64 sq. m; net area 3294.61 sq. m. RERA filing |
| Boundaries as filed | North: SAROORNAGAR ROAD; South: NEIGHBOURS PROPERTY; East: EXISTING 150 FEET ROAD PROPOSED 200 FEET ROAD; West: NEIGHBOURS SAW MILL. RERA filing |
Development identity
| Item | Sanction / filed record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | 2772/GHMC/SWBP/LBN1/2026, dated 03/02/2026; the permit also identifies file no. 005885/GHMC/ 02874/SWBP/LBN1/2025. |
| Approved built-up area | 11119.31 sq. m in the RERA project information. The building permit separately lists an area of 1112.75 sq. m in its sanctioned parameters; the supplied record does not label that figure as the total approved built-up area. RERA filing |
| Building count and configuration | One building; GHMC permit describes 2 Cellars + Ground Floor + 4 Floors, with building height 15.0 m. RERA filing |
| Parking provision | Permit lists total parking area 4892.78 sq. m and requires the approved cellar/stilt parking spaces to be used exclusively for vehicle parking. A parking-space count and detailed parking-level allocation are not supplied. |
| Unit counts | RERA filing: 65 commercial SHOP units. The permit extraction separately states “No. of units as sanctioned” as 2; the supplied records do not explain that figure’s scope or unit definition. RERA unit details |
Offering and status
| Item | RERA record / supplied evidence |
|---|---|
| Unit type and filed saleable area | SHOP; 202.32 sq. m per unit in the filed configuration. RERA unit details |
| Booked / available | 0 booked; 65 available, as read from the TG-RERA portal. The portal extract has no as-of date, so these counts are indicative. RERA unit details RERA unit table |
| Construction stage | RERA status is On-Going Project. No project construction-progress percentage or independent site-progress verification is supplied. RERA record RERA amenities |
| Completion dates | Original and revised proposed completion date: 03/02/2029. The GHMC permit also states completion before 03/02/2029. RERA record |
| OC / completion-certificate status | The supplied permit extraction records that completion is not certified; no occupancy certificate is supplied. This does not establish the status of any individual portion beyond the record provided. |
2. The project story
ACE CENTRUM is registered with TG-RERA as a commercial project at Bahadurguda, in Saroornagar Mandal, Ranga Reddy District, on SY NO 9/1 and 9/2. The RERA filing identifies 65 SHOP units, each with a filed saleable area of 202.32 sq. m; the portal-derived booking figures show 0 booked and 65 available, without an as-of date. RERA record RERA filing RERA unit details RERA unit table
The GHMC building permit describes one commercial building comprising 2 Cellars + Ground Floor + 4 Floors, with a height of 15.0 m. The RERA record classifies the project as ongoing and gives 03/02/2029 as its completion date. The supplied materials do not provide a construction-progress percentage or independent confirmation of work completed on site. No occupancy certificate is included; the permit requires an occupancy certificate before occupation. RERA record
3. Master plan, architecture & building design
The GHMC permit is for a single building with the use identified as commercial and the floor configuration 2 Cellars + Ground Floor + 4 Floors. It records a height of 15.0 m and setbacks of Front 6.0, Rear 2.5, Side I 2.5, Side II 2.5. These are permit-recorded figures; the supplied materials do not include detailed architectural drawings from which to describe a footprint, floor-by-floor arrangement, circulation, entrances, lifts or staircases.
The project record states a total site area of 3900.25 sq. m, road-affected area of 605.64 sq. m and net plot area of 3294.61 sq. m. RERA lists approved built-up area as 11119.31 sq. m. These are distinct filed measures; the provided permit extraction’s separate 1112.75 sq. m area is not identified there as total approved built-up area. RERA filing RERA filing
The permit lists a 50 sq. m Tot Lot and requires tree planting, a periphery greenery strip, a fenced Tot Lot maintained as greenery, and two rainwater-harvesting pits. These are recorded permit provisions, not evidence that the works have been completed.
4. Homes, configurations & floor plans
The RERA filing describes a commercial offering, not residential homes. Its filed unit schedule is:
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| SHOP | 65 | 0 | 65 | 202.32 sq. m per unit | Not supplied | Not supplied |
RERA unit details RERA unit table
The available floor-plan record reports one drawing, with no units measured from the drawing geometry. Accordingly, no software-measured carpet area, room dimensions or unit layout can be reported. The filed saleable area is the RERA figure; a separately measured carpet-area figure is not available in the supplied evidence. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records 4892.78 sq. m as total parking area and states that cellar and stilt spaces approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a count of parking spaces, a resident/visitor allocation, accessible spaces, or a unit-by-unit parking allocation in the evidence supplied. A drawn or sanctioned parking provision does not, by itself, establish exclusive parking rights for a particular purchaser.
The permit also requires parking places in buildings to be provided with electric-vehicle charging infrastructure; the supplied record does not state the number, location or capacity of charging points.
6. Amenities, recreation & open spaces
The following facilities appear in the supplied records. The amenity progress figures are recorded as 0%; they should not be read as independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot Lot / green strip | Permit lists Tot Lot 50 sq. m; also requires fencing and maintenance as greenery and a greenery strip around the site. | RERA amenities | Permit provision; completion not verified. |
| Rainwater harvesting | Permit lists 2 rainwater-harvesting pits. | RERA amenities | Permit provision; completion not verified. |
| Internal roads and footpaths | Listed in the project amenity schedule. | RERA amenities | Progress recorded as 0%. |
| Water supply | Listed as available in the amenity schedule. | RERA amenities | Progress recorded as 0%; installation or operation not independently verified. |
| Sewerage / sewage treatment and disposal | Sewerage facilities and treatment/disposal are listed in the amenity schedule; no system capacity or treatment-plant specification is supplied. | RERA amenities | Sewerage item marked “YES”; progress recorded as 0%. |
| Storm-water drains | Listed in the amenity schedule. | RERA amenities | Progress recorded as 0%. |
| Solid-waste management and disposal | Listed in the amenity schedule. | RERA amenities | Progress recorded as 0%. |
| Street lighting | Listed in the amenity schedule. | RERA amenities | Progress recorded as 0%. |
| Community buildings | Listed in the amenity schedule. | RERA amenities | Progress recorded as 0%; no facility description or size supplied. |
| Energy management | Listed in the amenity schedule. | RERA amenities | Progress recorded as 0%. |
| Recreational open space | Aggregate area is listed in the amenity schedule, but no area is supplied. | RERA amenities | Progress recorded as 0%. |
No clubhouse or indoor recreation facility is specified in the supplied evidence. RERA amenities
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, sewage/sullage treatment and disposal, storm-water drains, solid-waste management, rainwater harvesting, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. It does not provide water-source or storage details, treatment capacity, electrical capacity, backup arrangements, or waste-processing specifications; the schedule’s progress figures are 0% and do not independently establish completed or operational services. RERA amenities
The GHMC permit requires two rainwater-harvesting pits, space for a transformer, a garbage house within the premises, and provision of electric-vehicle charging infrastructure in building parking. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are permit conditions; the evidence supplied does not confirm implementation or provide lift counts, capacities, fire-system details or accessibility features.
The permit requires an occupancy Fire NOC before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. No occupancy certificate or Fire NOC is supplied in this evidence set.
8. Location, access & connectivity
The registered project location is WARD NO 3, BLOCK NO 2, BAHADURGUA, Bahadurguda village, Saroornagar Mandal, Ranga Reddy District, Telangana, PIN 500074. The cadastral parcel centroid is recorded at 17.62479, 79.02017. RERA filing RERA filing Location record
The filed boundaries identify SAROORNAGAR ROAD to the north and an existing 150 FEET ROAD with a proposed 200 FEET ROAD to the east. The building permit refers to an 18 mt. road width and includes road-widening-related conditions. The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 41.0 km; no public-transport details or additional measured distances are provided. RERA filing Location record
9. Developer & development status
The registered promoter is ACE SS INFRA, identified in the filing as a partnership. Its GSTIN is 36ACGFA3938F1ZG. The recorded promoter address is ACE MJ CAPITAL, LAXMINAGAR COLONY ROAD NO 2, ADJUCENT TO HUDA COLONY OF BAHADURGUDA, WARD NO 3, BLOCK NO 2, BAHADURGUA, Saroornagar, Ranga Reddy, 500074. RERA filing Corporate record Parties record
The RERA record states an intended completion date of 03/02/2029 and labels the project ongoing; the supplied materials do not provide a percentage of construction completed or independent site verification. No phase-wise construction status is supplied. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400011408; issued 06/11/2026; valid 03/02/2026–03/02/2029 |
|---|---|
| What the supplied record establishes | Form C registration for ACE CENTRUM, with registration conditions including a separate-account requirement, agreement-for-sale and conveyance obligations, and quarterly updates. |
| Identifier / date | 2772/GHMC/SWBP/LBN1/2026; 03/02/2026 |
|---|---|
| What the supplied record establishes | Permit for the commercial building on Survey Nos. 9/1 and 9/2, Bahadurguda; includes sanctioned configuration, site parameters and conditions. |
| Identifier / date | 005885/GHMC/ 02874/SWBP/LBN1/2025 |
|---|---|
| What the supplied record establishes | File number shown in the GHMC building permit order. |
| Identifier / date | Filed by M. Srikanth for M/s ACE SS INFRA |
|---|---|
| What the supplied record establishes | Promoter-declared title basis, encumbrance statement and undertaking to complete by 03-February-2029, together with project-fund and other undertakings. This is a promoter declaration, not an independent title verification. |
| Identifier / date | No occupancy certificate is supplied; the building permit requires one before occupation and requires an occupancy Fire NOC. |
|---|---|
| What the supplied record establishes | Certificate status is limited to the supplied documents. |
The supplied record also lists a GHMC mortgage deed reference, 462/2025, and a contractor’s all-risk policy number, 431190/44/2026/1333, in the building permit extraction.
1. Project at a glance
Project identity
Registered project name: ACE CENTRUM
Project type: Commercial; the RERA filing lists the offered units as SHOP.
Phase / registered portion: Phase not separately identified in the supplied record.
TG-RERA registration number: P02400011408
Registration validity: 03/02/2026 to 03/02/2029; the certificate states a three-year registration period. This is the registration validity, not a completion certificate.
Registered promoter: ACE SS INFRA
RERA status: RERA-recorded status is On-Going Project; registration certificate issued 06/11/2026.
Land and geographic identity
Locality: WARD NO 3, BLOCK NO 2, BAHADURGUA
Revenue village: Bahadurguda
Mandal: Saroornagar
District: Ranga Reddy
PIN: 500074
Project survey numbers: SY NO 9/1 and 9/2
Site extent: Total area 3900.25 sq. m; area affected by road widening/FTL of tanks/nala widening 605.64 sq. m; net area 3294.61 sq. m.
Boundaries as filed: North: SAROORNAGAR ROAD; South: NEIGHBOURS PROPERTY; East: EXISTING 150 FEET ROAD PROPOSED 200 FEET ROAD; West: NEIGHBOURS SAW MILL.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 2772/GHMC/SWBP/LBN1/2026, dated 03/02/2026; the permit also identifies file no. 005885/GHMC/ 02874/SWBP/LBN1/2025.
Approved built-up area: 11119.31 sq. m in the RERA project information. The building permit separately lists an area of 1112.75 sq. m in its sanctioned parameters; the supplied record does not label that figure as the total approved built-up area.
Building count and configuration: One building; GHMC permit describes 2 Cellars + Ground Floor + 4 Floors, with building height 15.0 m.
Parking provision: Permit lists total parking area 4892.78 sq. m and requires the approved cellar/stilt parking spaces to be used exclusively for vehicle parking. A parking-space count and detailed parking-level allocation are not supplied.
Unit counts: RERA filing: 65 commercial SHOP units. The permit extraction separately states “No. of units as sanctioned” as 2; the supplied records do not explain that figure’s scope or unit definition.
Offering and status
Unit type and filed saleable area: SHOP; 202.32 sq. m per unit in the filed configuration.
Booked / available: 0 booked; 65 available, as read from the TG-RERA portal. The portal extract has no as-of date, so these counts are indicative.
Construction stage: RERA status is On-Going Project. No project construction-progress percentage or independent site-progress verification is supplied.
Completion dates: Original and revised proposed completion date: 03/02/2029. The GHMC permit also states completion before 03/02/2029.
OC / completion-certificate status: The supplied permit extraction records that completion is not certified; no occupancy certificate is supplied. This does not establish the status of any individual portion beyond the record provided.
2. The project story
ACE CENTRUM is registered with TG-RERA as a commercial project at Bahadurguda, in Saroornagar Mandal, Ranga Reddy District, on SY NO 9/1 and 9/2. The RERA filing identifies 65 SHOP units, each with a filed saleable area of 202.32 sq. m; the portal-derived booking figures show 0 booked and 65 available, without an as-of date.
The GHMC building permit describes one commercial building comprising 2 Cellars + Ground Floor + 4 Floors, with a height of 15.0 m. The RERA record classifies the project as ongoing and gives 03/02/2029 as its completion date. The supplied materials do not provide a construction-progress percentage or independent confirmation of work completed on site. No occupancy certificate is included; the permit requires an occupancy certificate before occupation.
3. Master plan, architecture & building design
The GHMC permit is for a single building with the use identified as commercial and the floor configuration 2 Cellars + Ground Floor + 4 Floors. It records a height of 15.0 m and setbacks of Front 6.0, Rear 2.5, Side I 2.5, Side II 2.5. These are permit-recorded figures; the supplied materials do not include detailed architectural drawings from which to describe a footprint, floor-by-floor arrangement, circulation, entrances, lifts or staircases.
The project record states a total site area of 3900.25 sq. m, road-affected area of 605.64 sq. m and net plot area of 3294.61 sq. m. RERA lists approved built-up area as 11119.31 sq. m. These are distinct filed measures; the provided permit extraction’s separate 1112.75 sq. m area is not identified there as total approved built-up area.
The permit lists a 50 sq. m Tot Lot and requires tree planting, a periphery greenery strip, a fenced Tot Lot maintained as greenery, and two rainwater-harvesting pits. These are recorded permit provisions, not evidence that the works have been completed.
4. Homes, configurations & floor plans
The RERA filing describes a commercial offering, not residential homes. Its filed unit schedule is:
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| SHOP | 65 | 0 | 65 | 202.32 sq. m per unit | Not supplied | Not supplied |
The available floor-plan record reports one drawing, with no units measured from the drawing geometry. Accordingly, no software-measured carpet area, room dimensions or unit layout can be reported. The filed saleable area is the RERA figure; a separately measured carpet-area figure is not available in the supplied evidence.
5. Parking & vehicle circulation
The GHMC permit records 4892.78 sq. m as total parking area and states that cellar and stilt spaces approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a count of parking spaces, a resident/visitor allocation, accessible spaces, or a unit-by-unit parking allocation in the evidence supplied. A drawn or sanctioned parking provision does not, by itself, establish exclusive parking rights for a particular purchaser.
The permit also requires parking places in buildings to be provided with electric-vehicle charging infrastructure; the supplied record does not state the number, location or capacity of charging points.
6. Amenities, recreation & open spaces
The following facilities appear in the supplied records. The amenity progress figures are recorded as 0%; they should not be read as independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot Lot / green strip | Permit lists Tot Lot 50 sq. m; also requires fencing and maintenance as greenery and a greenery strip around the site. | Permit provision; completion not verified. | |
| Rainwater harvesting | Permit lists 2 rainwater-harvesting pits. | Permit provision; completion not verified. | |
| Internal roads and footpaths | Listed in the project amenity schedule. | Progress recorded as 0%. | |
| Water supply | Listed as available in the amenity schedule. | Progress recorded as 0%; installation or operation not independently verified. | |
| Sewerage / sewage treatment and disposal | Sewerage facilities and treatment/disposal are listed in the amenity schedule; no system capacity or treatment-plant specification is supplied. | Sewerage item marked “YES”; progress recorded as 0%. | |
| Storm-water drains | Listed in the amenity schedule. | Progress recorded as 0%. | |
| Solid-waste management and disposal | Listed in the amenity schedule. | Progress recorded as 0%. | |
| Street lighting | Listed in the amenity schedule. | Progress recorded as 0%. | |
| Community buildings | Listed in the amenity schedule. | Progress recorded as 0%; no facility description or size supplied. | |
| Energy management | Listed in the amenity schedule. | Progress recorded as 0%. | |
| Recreational open space | Aggregate area is listed in the amenity schedule, but no area is supplied. | Progress recorded as 0%. |
No clubhouse or indoor recreation facility is specified in the supplied evidence.
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, sewage/sullage treatment and disposal, storm-water drains, solid-waste management, rainwater harvesting, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. It does not provide water-source or storage details, treatment capacity, electrical capacity, backup arrangements, or waste-processing specifications; the schedule’s progress figures are 0% and do not independently establish completed or operational services.
The GHMC permit requires two rainwater-harvesting pits, space for a transformer, a garbage house within the premises, and provision of electric-vehicle charging infrastructure in building parking. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are permit conditions; the evidence supplied does not confirm implementation or provide lift counts, capacities, fire-system details or accessibility features.
The permit requires an occupancy Fire NOC before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. No occupancy certificate or Fire NOC is supplied in this evidence set.
8. Location, access & connectivity
The registered project location is WARD NO 3, BLOCK NO 2, BAHADURGUA, Bahadurguda village, Saroornagar Mandal, Ranga Reddy District, Telangana, PIN 500074. The cadastral parcel centroid is recorded at 17.62479, 79.02017.
The filed boundaries identify SAROORNAGAR ROAD to the north and an existing 150 FEET ROAD with a proposed 200 FEET ROAD to the east. The building permit refers to an 18 mt. road width and includes road-widening-related conditions. The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 41.0 km; no public-transport details or additional measured distances are provided.
9. Developer & development status
The registered promoter is ACE SS INFRA, identified in the filing as a partnership. Its GSTIN is 36ACGFA3938F1ZG. The recorded promoter address is ACE MJ CAPITAL, LAXMINAGAR COLONY ROAD NO 2, ADJUCENT TO HUDA COLONY OF BAHADURGUDA, WARD NO 3, BLOCK NO 2, BAHADURGUA, Saroornagar, Ranga Reddy, 500074.
The RERA record states an intended completion date of 03/02/2029 and labels the project ongoing; the supplied materials do not provide a percentage of construction completed or independent site verification. No phase-wise construction status is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400011408; issued 06/11/2026; valid 03/02/2026–03/02/2029 |
|---|---|
| What the supplied record establishes | Form C registration for ACE CENTRUM, with registration conditions including a separate-account requirement, agreement-for-sale and conveyance obligations, and quarterly updates. |
| Identifier / date | 2772/GHMC/SWBP/LBN1/2026; 03/02/2026 |
|---|---|
| What the supplied record establishes | Permit for the commercial building on Survey Nos. 9/1 and 9/2, Bahadurguda; includes sanctioned configuration, site parameters and conditions. |
| Identifier / date | 005885/GHMC/ 02874/SWBP/LBN1/2025 |
|---|---|
| What the supplied record establishes | File number shown in the GHMC building permit order. |
| Identifier / date | Filed by M. Srikanth for M/s ACE SS INFRA |
|---|---|
| What the supplied record establishes | Promoter-declared title basis, encumbrance statement and undertaking to complete by 03-February-2029, together with project-fund and other undertakings. This is a promoter declaration, not an independent title verification. |
| Identifier / date | No occupancy certificate is supplied; the building permit requires one before occupation and requires an occupancy Fire NOC. |
|---|---|
| What the supplied record establishes | Certificate status is limited to the supplied documents. |
The supplied record also lists a GHMC mortgage deed reference, 462/2025, and a contractor’s all-risk policy number, 431190/44/2026/1333, in the building permit extraction.
Frequently asked questions
Is ACE CENTRUM registered with Telangana RERA?
Yes. ACE CENTRUM is registered with the Telangana Real Estate Regulatory Authority as P02400011408; the registration status is On-Going Project.
Who is the developer of ACE CENTRUM?
The promoter named in the RERA registration is ACE SS INFRA.
Where is ACE CENTRUM located?
ACE CENTRUM is in WARD NO 3, BLOCK NO 2, BAHADURGUA, Bahadurguda, Saroornagar, Rangareddy, Telangana (500074).
When will ACE CENTRUM be completed?
The promoter's proposed date of completion filed with RERA is 03/02/2029. This is the promoter's declaration, not a guarantee.