Sign in

Urban Nest

SRI LAKSHMI GANAPATHI DEVELOPERS · Hanamkonda · RERA P00300009178

URBAN NEST is a residential open-plot layout in Madikonda, Khazipet Mandal, Warangal Urban district, developed by registered promoter SRI LAKSHMI GANAPATHI DEVELOPERS. The registered site extent is 52,360.80 sq.m, and the final-layout record states 158 plots; individual plot configurations are not disclosed. The project is registered under TG-RERA P00300009178, with a proposed completion date of 24/05/2026.

01What we found

Period endedTG-RERA registration ran to 24 May 2026 - check its extension on TG-RERA
47documents on file - each fact links to its page
1court case on this project's land (survey 1922, Madikonda)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameURBAN NEST. RERA record
Project typePlotted development / open-plot residential layout. RERA record RERA filing
Phase / registered portionNot separately identified as a numbered phase. The TG-RERA certificate names URBAN NEST; the filed location and survey schedule identify the Madikonda land. RERA record
TG-RERA registrationP00300009178. RERA record
Registration validity24/05/2024 to 24/05/2026, for two years unless extended by the Authority. This is the registration period, not the layout’s infrastructure-completion date. RERA record
Registered promoterSRI LAKSHMI GANAPATHI DEVELOPERS, a partnership. RERA record RERA filing Corporate record
RERA statusThe supplied record labels the project “New Project” and records the registration above. The materials supplied do not establish a later registration extension or current registration status. RERA filing

Land and geographic identity

ItemProject record
LocalityMadikonda.
Revenue villageMadikonda.
Mandal / district / PINKhazipet / Warangal Urban / 506003. RERA record
Project survey numbers and subdivisionsSY NO 1922/B, 1922/E, 1924/C/2/2, 1924/C/2/1, 1924/B, 1924/D/3, 1925/A/2, 1925/C/3, 1925/D/1 AND 1925/D/2.
Registered site extent52,360.80 sq.m (RERA land record). RERA filing Land records
Total / net layout area in final-layout record52,321.46 sq.m (shown as total layout area in the final-layout proceeding).
Boundaries in RERA land recordEast: remaining land of Sri Lakshmi Ganapathi Developers; West: agriculture land of Narsimha Reddy; North: approved TLP No. 0394 LO 3006 2023; South: 18MT wide existing / 24MT wide proposed road. RERA filing

Development identity

ItemProject record
Principal layout approvalTentative layout approval 0369/LO/3006/2024, dated 24 May 2024, issued by GWMC Municipality/Municipal Corporation.
Final layout proceeding0060/GWMC/SWFL/2025, dated 20/11/2025, issued by Greater Warangal Municipal Corporation.
Approved use and scaleResidential open-plot layout; the final-layout record states 158 plots.
Approved built-up area / building configurationIndividual building permissions are to be considered separately; no project-wide approved built-up area, building count or floor configuration is disclosed for this plotted layout.
ParkingFinal-layout land-use schedule states common parking area 0.00 sq.m (0%). Individual plot/building parking provision is not stated in the supplied project-level records.

Offering and status

ItemProject record
OfferingResidential plots. The approved final layout identifies 158 plots; plot-wise sizes and current inventory are not available in the supplied records. Layout record
RERA-filed saleable size range / booked / availableNot disclosed in the supplied data.
Construction / infrastructure stageRERA amenity entries mark internal roads and footpaths, water supply, storm-water drains, green strip/tot-lot/park, street lighting, rainwater harvesting, electrical meter room/sub-station/receiving station and recreational open space as available at 100%; these are filing entries, not independent verification of site condition. RERA amenities
Infrastructure completion deadline stated in tentative approvalWithin 2 years (24 May, 2026) from the 24 May 2024 approval.
TG-RERA proposed completion date24/05/2026. RERA record RERA filing
Occupancy / completion certificate statusThe supplied record includes an architect’s Form–1A dated 20/02/2026 that refers to an OC numbered 004327/GWMC/00078/SWFL/2025, dated 20/11/2025. Its stated project scope includes TG-RERA numbers P00300009178 and P00300009174; the supplied material does not establish that this certificate covers only P00300009178.
Site progress independently verifiedNo independent site inspection or measurement is supplied.

2. The project story

URBAN NEST is registered as a residential plotted-development project at Madikonda, in Khazipet Mandal, Warangal Urban district. Its RERA land schedule identifies ten survey numbers/subdivisions and a proposed completion date of 24/05/2026. The municipal record describes a residential open-plot layout, and its final-layout proceeding lists 158 plots. Plot-wise dimensions, availability and booking figures are not provided here. RERA record

The municipal record sets out layout roads, open space, social infrastructure and utility land, with infrastructure and amenities to be completed by the stated deadline. TG-RERA’s amenity entries show several layout services and open-space items as 100% available, but these are reported filing values rather than an independent site-verification result. The supplied architect’s certificate refers to an occupancy certificate, but the certificate names two TG-RERA registrations; the evidence supplied does not establish the certificate’s precise project/phase scope for this registration. RERA amenities

3. Master plan, architecture & building design

This is a plotted layout, not a project of apartment towers. The final-layout proceeding records a total layout area of 52,321.46 sq.m and allocates it as follows:

Land useAreaShare stated in final-layout record
Plotted area29,312.66 sq.m56.02%
Road area16,438.51 sq.m31.42%
Open space area4,723.96 sq.m9.03%
Social infrastructure area1,315.84 sq.m2.51%
Utility area530.06 sq.m1.01%
Common parking area0.00 sq.m0%
Total layout area52,321.46 sq.m100%

These are figures from the final-layout proceeding, not a survey-derived remeasurement. The proceeding lists plot numbers 1 through 158, with gaps visible in the plan. Internal road widths listed in that record include 9.14m, 12.2m, 12.19m and 9.17m; it also lists an 18.29m existing road width and 24.39m proposed road width. Layout record

The layout record identifies open space, social infrastructure and utility land, but does not provide building designs, project-wide built-up area, or a project-wide configuration of future buildings. Individual building permissions are to be considered separately.

4. Homes, configurations & floor plans

The project offering is plots, not RERA-filed apartment configurations. The final-layout proceeding lists 158 plots, but plot-wise dimensions, plot-size bands, booked and available counts, and RERA saleable areas are not supplied. Layout record

A separate drawing measurement record concerns a 3BHK apartment plan in document 520070, not this project’s plotted layout. It reports a software-measured carpet-area median of 100.9 sq.m (range 89.0–113.4 sq.m) across six measured designs; these measurements are drawing-derived, require review, and are not RERA-filed figures for URBAN NEST. They therefore do not describe the plot offering. Floor plans

5. Parking & vehicle circulation

The final-layout land-use schedule records 0.00 sq.m (0%) as common parking area. No project-level count of resident, visitor or accessible spaces, parking allocation arrangement, or plot-specific parking provision is available in the supplied records.

Internal roads are shown in the final-layout record, including widths of 9.14m, 12.2m, 12.19m and 9.17m. The record also identifies an 18.29m existing road width and a 24.39m proposed road width. These are layout-road figures; the supplied data does not establish vehicle-entry arrangements, pedestrian separation, EV facilities or individual plot access conditions.

6. Amenities, recreation & open spaces

Category / facilityDescription / sizeEvidence sourceDeclared progress / verified status
Landscape / open spaceOpen space area 4,723.96 sq.m (9.03%) in the final-layout schedule.Approved land-use allocation; site delivery not independently verified.
Landscape / parkRERA filing lists “Green Strip/TOT LOT/Park” as available at 100%.RERA amenitiesPromoter/RERA-filed status; not independently verified.
Social infrastructure1,315.84 sq.m (2.51%) in the final-layout schedule.Approved land-use allocation; facility type and delivery status not specified.
Utility land530.06 sq.m (1.01%) in the final-layout schedule.Approved land-use allocation; not a recreation amenity.
Community buildingsRERA amenity entry shows 0%.RERA amenitiesFiled status; no community building is identified as delivered.

No clubhouse or indoor-recreation facilities, sports facilities, or separate convenience/community amenity list with dimensions or capacities is established in the supplied project records.

7. Utilities, building services & safety

The RERA amenity entries report water supply, storm-water drains, street lighting, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. These percentages are filing entries, not independent verification. The same RERA amenity schedule records sewerage (chambers, lines, septic tank, STP), treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. RERA amenities

The tentative-layout approval lists proposed infrastructure including a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management, storm-water drains, internal water-supply pipelines, overhead tank, street lights, avenue plantation and rainwater-harvesting pits. The final-layout proceeding likewise lists a water reservoir, septic tank, sewerage treatment plant, electric transformer, solid-waste management and garbage bin among utilities/amenities. These records describe approval or listed infrastructure; they do not establish installed capacity or completed operation.

No project-specific storage capacities, water-source details, treatment/reuse capacities, electrical backup details, security system or accessibility specifications are supplied.

8. Location, access & connectivity

The registered location is Madikonda, Khazipet, Warangal Urban, Telangana 506003, with the project land identified in the ten survey numbers listed above. The RERA land record describes the southern boundary as an 18MT wide existing / 24MT wide proposed road. The final-layout proceeding lists internal roads and an 18.29m existing road width and 24.39m proposed road width. RERA filing

The supplied location record gives an approximate sampled distance of 102.2 km to the nearest sampled Outer Ring Road interchange. No other measured distances, public-transport details or verified travel times are supplied. Location record

9. Developer & development status

The registered promoter is SRI LAKSHMI GANAPATHI DEVELOPERS, identified in the project record as a partnership, with GSTIN 36AEYFS6758P1ZJ. The RERA record lists the promoter address as H NO 23-6-150/121/A, HUNTER ROAD, MADIKONDA, WARANGAL DISTRICT, Khazipet, Warangal Urban, 506003. The supplied materials do not provide an official project website or contact details for this overview. Corporate record RERA filing RERA filing

The project record gives a proposed completion date of 24/05/2026, while the tentative-layout approval requires infrastructure and amenities to be completed within two years from 24 May 2024, also stating 24 May, 2026. The amenity progress percentages are promoter/RERA-filed declarations; no independent site-progress assessment is supplied. RERA record RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300009178; valid 24/05/2024–24/05/2026
RelevanceForm C certificate for URBAN NEST; names the promoter and registered project land.
Tentative layout approval
Identifier / date0369/LO/3006/2024; 24 May, 2024
RelevanceGWMC approval for a 158-plot residential layout on the listed Madikonda survey numbers.
Final layout proceeding
Identifier / date0060/GWMC/SWFL/2025; 20/11/2025
RelevanceGWMC final-layout record; states 158 plots and provides the layout land-use schedule.
Layout mortgage recorded in approval
Identifier / dateMortgage Deed 10524/2024; 17 May, 2024
RelevanceTentative-layout record identifies specified plots as mortgaged to the Municipality/Municipal Corporation.
Architect’s Form–1A / OC reference
Identifier / dateForm dated 20/02/2026; OC 004327/GWMC/00078/SWFL/2025, dated 20/11/2025
RelevanceCertificate refers to TG-RERA registrations P00300009178 and P00300009174; the supplied record does not establish its exact scope for this registration alone.
RERA land schedule
Identifier / dateTen listed Madikonda survey numbers; registered site extent 52,360.80 sq.m
RelevanceProject land and boundary details. RERA filing

The supplied documents also include the promoter’s Form B declaration for URBAN NEST.

Frequently asked questions

Is URBAN NEST registered with Telangana RERA?

Yes. URBAN NEST is registered with the Telangana Real Estate Regulatory Authority as P00300009178; the registration status is New Project.

Who is the developer of URBAN NEST?

The promoter named in the RERA registration is SRI LAKSHMI GANAPATHI DEVELOPERS.

Where is URBAN NEST located?

URBAN NEST is in WARANGAL DISTRICT, Madikonda, Khazipet, Hanamkonda, Telangana (506003).

When will URBAN NEST be completed?

The promoter's proposed date of completion filed with RERA is 24/05/2026. This is the promoter's declaration, not a guarantee.

More projects in Madikonda